Shifting Of Tube Well Pump House Boundary Wall Works Other Work In Existing Water Supply Scheme Including Survey Design Site Investigation Planning Supply Of All Materials Labour T P Complete In All Respect On Turn Key Basis After Completi
|
Description |
Shifting Of Tube Well Pump House Boundary Wall Works Other Work In Existing Water Supply Scheme Including Survey Design Site Investigation Planning Supply Of All Materials Labour T P Complete In All Respect On Turn Key Basis After Completi
|
Organisation | UP Jal Nigam Gra(HQ) Lucknow | State Govt. and UT |
Tender Id | 2025_UPJNG_1011536_1 |
Reference Number |
191/M-7/30/Dated20.02.2025 |
Tender Fee | 3540 |
EMD | 1.1 Lakh |
Tender Value | |
Place | Itaura Buzurg Rohaniya Raebareli |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1815750 |
Start Date | February 27, 2025 14:30 |
End Date |
06/03/2025 ( Expired 66 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Survey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur
Survey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur
Read moreConstruction of boundary wall and allied works at 2nd. tube well site of dumri nakrasuli and its adjoining mouzas pipe water supply scheme within sankrail block under gopiballavpur sub division within jhargram division, p.h.e.dt (total length 50mtr,c
Construction of boundary wall and allied works at 2nd. tube well site of dumri nakrasuli and its adjoining mouzas pipe water supply scheme within sankrail block under gopiballavpur sub division within jhargram division, p.h.e.dt (total length 50mtr,c
Read moreInvestigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete
Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india
Read moreShifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete
Shifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete
Read moreRepair and prive maintenance of tube well including submersible pump sets(125 mm and 150 mm), panel of tubewell etc. in complete respect for round the clock working condition for water supply scheme under jurisdiction of city dn. iii (north), ja
Repair and prive maintenance of tube well including submersible pump sets(125 mm and 150 mm), panel of tubewell etc. in complete respect for round the clock working condition for water supply scheme under jurisdiction of city dn. iii (north), ja
Read moreFirst class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at dhrupdanga zone-13 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at dhrupdanga zone-13 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of oht tube well pump house toilet boundary wall and laying and jointing of rising main and distribution system, providing household connection with amr water meter work of sanskrati lok colony water supply scheme under sasci programe
Construction of oht tube well pump house toilet boundary wall and laying and jointing of rising main and distribution system, providing household connection with amr water meter work of sanskrati lok colony water supply scheme under sasci programe
Read moreShifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete
Shifting and laying of water supply under cm grid programme including supply of all labour materials t and p etc complete
Read moreBank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e