Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Shifting Of Tube Well Pump House Boundary Wall Works Other Work In Existing Water Supply Scheme Including Survey Design Site Investigation Planning Supply Of All Materials Labour T P Complete In All Respect On Turn Key Basis After Completi
|
Description |
Shifting Of Tube Well Pump House Boundary Wall Works Other Work In Existing Water Supply Scheme Including Survey Design Site Investigation Planning Supply Of All Materials Labour T P Complete In All Respect On Turn Key Basis After Completi
|
Organisation | UP Jal Nigam Gra(HQ) Lucknow | State Govt. and UT |
Tender Id | 2025_UPJNG_1011536_1 |
Reference Number |
191/M-7/30/Dated20.02.2025 |
Tender Fee | 3540 |
EMD | 1.1 Lakh |
Tender Value | |
Place | Itaura Buzurg Rohaniya Raebareli |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1815750 |
Start Date | February 27, 2025 14:30 |
End Date |
06/03/2025 ( Expired 112 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreRevised piped water supply scheme of for fhtc at village kodar, bartarai and ratheli block manpur distt. umaria based on existing source including survey, investigation, design and construction of r.c.c. sumpwell with installation of submersible pump
Revised piped water supply scheme of for fhtc at village kodar, bartarai and ratheli block manpur distt. umaria based on existing source including survey, investigation, design and construction of r.c.c. sumpwell with installation of submersible pump
Read moreRevised piped water supply scheme of for fhtc at village malachua and amiliha block pali distt. umaria based on existing source including survey, investigation, design and construction of r.c.c. sumpwell with installation of submersible pump, laying
Revised piped water supply scheme of for fhtc at village malachua and amiliha block pali distt. umaria based on existing source including survey, investigation, design and construction of r.c.c. sumpwell with installation of submersible pump, laying
Read moreRevised piped water supply scheme of for fhtc at village karkeli, barhi and dhanwar block karkeli distt. umaria based on existing source including survey, investigation, design and construction of r.c.c. sumpwell with installation of submersible pump
Revised piped water supply scheme of for fhtc at village karkeli, barhi and dhanwar block karkeli distt. umaria based on existing source including survey, investigation, design and construction of r.c.c. sumpwell with installation of submersible pump
Read moreSupply all materials labour t and p erection testing and commissioning of external power supply to village goilpita_source under patnagarh block in balangir district
Supply all materials labour t and p erection testing and commissioning of external power supply to village goilpita_source under patnagarh block in balangir district
Read moreInvestigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete
Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage &#x0d works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district &#x0d lucknow up india &#x0d
Read moreImprovement water supply scheme bhiwani town providing and fixing 01 no shallow tube well at ram nagar boosting station in bhiwani as per direction given by worthy dc bhiwani complete in all respect and all other works contingent thereto
Improvement water supply scheme bhiwani town providing and fixing 01 no shallow tube well at ram nagar boosting station in bhiwani as per direction given by worthy dc bhiwani complete in all respect and all other works contingent thereto
Read moreImprovement water supply scheme bhiwani town providing and fixing shallow tube well at fire brigade office in front of panchayat bhawan in bhiwani as per direction given by worthy dc bhiwani complete in all respect and all other works contingent ther
Improvement water supply scheme bhiwani town providing and fixing shallow tube well at fire brigade office in front of panchayat bhawan in bhiwani as per direction given by worthy dc bhiwani complete in all respect and all other works contingent ther
Read moreof your Industry type