Tender Details
Particulars | Details |
---|---|
Title |
Shifting Works Of Pipeline And Other Work In Existing Water Supply Scheme Including Survey Design Site Investigation Planning Supply Of All Materials Labour T P Complete In All Respect On Turn Key Basis
|
Description |
Shifting Works Of Pipeline And Other Work In Existing Water Supply Scheme Including Survey Design Site Investigation Planning Supply Of All Materials Labour T P Complete In All Respect On Turn Key Basis
|
Organisation | UP Jal Nigam Gra(HQ) Lucknow | State Govt. and UT |
Tender Id | 2025_UPJNG_1011592_1 |
Reference Number |
191/M-7/30 Dated 20.02.2025 |
Tender Fee | 3540 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Sataon and Harchandpur Block of District raebareli |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1815890 |
Start Date | February 27, 2025 14:30 |
End Date |
06/03/2025 ( Expired 65 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Survey, investigation and execution for de-silting and associated works of existing storm water drainage pipeline in varanasi city, u.p. under deposit program (pkg-1)
Survey, investigation and execution for de-silting and associated works of existing storm water drainage pipeline in varanasi city, u.p. under deposit program (pkg-1)
Read moreDesign, development and upgradation of existing water supply system along with other civil works with one year o andm for panagarg zone ii and wtp for 5.32 mgd capacity panagarh industrial park water supply scheme under dwsd, p.h.e. dte
Design, development and upgradation of existing water supply system along with other civil works with one year o andm for panagarg zone ii and wtp for 5.32 mgd capacity panagarh industrial park water supply scheme under dwsd, p.h.e. dte
Read moreSurvey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur
Survey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur
Read moreExtension of distribution pipe line connecting existing household connection with distribution pipeline in various villages as per site requirement and other appurtenant works under dewalchaura gov pumping water supply scheme
Extension of distribution pipe line connecting existing household connection with distribution pipeline in various villages as per site requirement and other appurtenant works under dewalchaura gov pumping water supply scheme
Read moreSupply, erection, testing, commissioning of following works in nizamabad (erstwhile) district on turnkey basis. lot-i: 132/33kv ss pitlam (2x50mva ptrs) ii) 132kv dc/sc line (26.5km) from 220/132/33kv ss banswada to proposed 132/33kv ss pitlam iii) 132kv feeder bay at 220kv ss banswada lot-ii: (i) 220kv dc line (43km) from existing 220/132kv ss kamareddy to 220/11kv liss at yacharam thanda and connected 220kv bays
Supply, erection, testing and commissioning of following works in nizamabad (erstwhile) district on turnkey basis. lot-i: 132/33kv ss pitlam (2x50mva ptrs) ii) 132kv dc/sc line (26.5km) from 220/132/33kv ss banswada to proposed 132/33kv ss pitlam iii) 132kv feeder bay at 220kv ss banswada lot-ii: (i) 220kv dc line (43km) from existing 220/132kv ss kamareddy to 220/11kv liss at yacharam thanda ii) 1no. 220kv bay extension including bus extension at 220/132kv ss kamareddy (iii) 2nos. 220kv bay extensions at 220/11kv ss yacharam thanda (iv) 220kv bay extension at 220/132kv ss kamareddy
Read moreSupply, delivery and lowering of submersible pumping machinery with allied works at p/h no.-i of bharatpur ground water based water supply scheme under medb, phe dte. in murshidabad.
Supply, delivery and lowering of submersible pumping machinery with allied works at p/h no.-i of bharatpur ground water based water supply scheme under medb, phe dte. in murshidabad.
Read moreShifting of existing water supply pipeline coming under alignment of village road proposed for widening in dnh area (7th call)
Shifting of existing water supply pipeline coming under alignment of village road proposed for widening in dnh area (7th call)
Read moreInstallation of solar photovoltaic water pumping systems and stand-alone community water purification plants in tripura on turn-key basis
Survey, design, manufacture, supply, erection, testing and commissioning of solar photovoltaic water pumping systems and cwpp including creation of water source on turn-key basis in tripura as per dnie-t
Read moreProviding improved access to water through household connection in various existing water supply schemes block majitha distt. amritsar under jjm-nwqsm- nabard xxvi section 15-1 part of surface water project gaunsal afgana
Prov. house connection for existing and new pipe line prov. laying jointing testing pvc pipe specials sluice valve chamber chlorinator replacement of control panel repair of pump chamber ohsr and all other works complete in all respect.
Read moreProviding improved access to water through household connection in various existing water supply schemes block majitha distt. amritsar. under jjm-nwqsm- nabard xxvi section-15 part-ii part of surface water project gaunsal afgana
Prov. house connection for existing and new pipe line prov. laying jointing testing pvc pipe specials sluice valve chamber chlorinator replacement of control panel repair of pump chamber ohsr and all other works complete in all respect
Read moreof your Industry type