Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Works Of Pipeline Other Works In Existing Water Supply Scheme Including Survey Design Site Investigation Planning Supply Of All Materials Labour T P Complete In All Respect On Turn Key Basis After Completion Commissioning And Completion
|
| Description |
Shifting Works Of Pipeline Other Works In Existing Water Supply Scheme Including Survey Design Site Investigation Planning Supply Of All Materials Labour T P Complete In All Respect On Turn Key Basis After Completion Commissioning And Completion
|
| Organisation | UP Jal Nigam Gra(HQ) Lucknow | State Govt. and UT |
| Tender Id | 2025_UPJNG_1063584_1 |
|
Reference Number |
1529/M-7/193 Dated 25.07.2025 |
| Tender Fee | 11800 |
| EMD | 2.5 Lakh |
| Tender Value | - |
| Place | Raebareli |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1938267 |
| Start Date | August 07, 2025 14:30 |
| End Date |
Expired
21/08/2025
Expired 420 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 33 kv line near baghada over bridge sabji mandi on semi turn key basis in deposit scheme under, e.u.d.d. rambagh, prayagraj
Refer to tender description
Read moreShifting of lines and material for ramghat road widening from tarun velly to royal homes under mdr-105 on semi turn-key basis under the area eudc, aligarh
Shifting of lines and material for ramghat road widening from tarun velly to royal homes under mdr-105 on semi turn-key basis under the area eudc, aligarh
Read moreWork for shifting of 11kv, l.t. lines and other associated materials for road widening from kyampur mod to etah chungi on semi turn-key basis under the area eudc, aligarh
Work for shifting of 11kv, l.t. lines and other associated materials for road widening from kyampur mod to etah chungi on semi turn-key basis under the area eudc, aligarh
Read morePreparation of gis based maps (base map, infrastructure map and land use map, etc.), and creation of data bank and planning report after physical and socio-economic survey for the rural areas of part of howrah and hooghly districts withinkol(3rd call
Kmda/civil/e and am/planning circle/se/09 of 2026-27, dt. 01.10.2026
Read moreConsultancy services for engg. consultancy services including site survey and soil investigation for technology for high energy and allied materials for new generation armament and missile system, theam ngarms at hemrl, pune
Consultancy services for engg. consultancy services including site survey and soil investigation for technology for high energy and allied materials for new generation armament and missile system, theam ngarms at hemrl, pune
Read moreShifting, loading, carting and unloading installation, testing, commissioning and dismentalling after mela of the pumping plant (28 nos), dozer (56 nos) , d.g. set (28 nos) and stabilizer etc all complete from mela store to different tubewell site in
Shifting, loading, carting and unloading installation, testing, commissioning and dismentalling after mela of the pumping plant (28 nos), dozer (56 nos) , d.g. set (28 nos) and stabilizer etc all complete from mela store to different tubewell site in
Read moreSupply of all materials, labour, t and p required for shifting of the 0.443 km existing trunk sewer line of 300 or 350 mm dia rcc np-3 pipe at vikramaditya marg, lucknow including, survey, investigation, dismantling and excavation of roads
Supply of all materials, labour, t and p required for shifting of the 0.443 km existing trunk sewer line of 300 or 350 mm dia rcc np-3 pipe at vikramaditya marg, lucknow including, survey, investigation, dismantling and excavation of roads
Read moreShifting and opening of wooden packets with mechanical tools and assistance in making shortage or damage inventory of all the received transmitter at hpt site stok, leh ladakh.,packing of spare items after verification of transmitter material or equipments in packages in transmitter building at hpt site stok, leh ladakh.,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for transmitter rack unit 02nos and rf changeover switch as per details at hpt stok, leh ladakh,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for dummy load as per details at hpt site stok, leh ladakh.,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for dehydrator as per details at hpt site stok, leh ladakh.,installation of 05kw 1 plus 1 fm transmitter and accessories as per due care and consultation with engineer incharge or installation officer at hpt site stok, leh ladakh.,in
Shifting and opening of wooden packets with mechanical tools and assistance in making shortage or damage inventory of all the received transmitter at hpt site stok, leh ladakh.,packing of spare items after verification of transmitter material or equipments in packages in transmitter building at hpt site stok, leh ladakh.,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for transmitter rack unit 02nos and rf changeover switch as per details at hpt stok, leh ladakh,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for dummy load as per details at hpt site stok, leh ladakh.,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for dehydrator as per details at hpt site stok, leh ladakh.,installation of 05kw 1 plus 1 fm transmitter and accessories as per due care and consultation with engineer incharge or installation officer at hpt site stok, leh ladakh.,in
Read moreShifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi
Shifting of tube well pump house boundary wall works other work in existing water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after completi
Read moreShifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Shifting and tube well pump house boundary wall works other works in itaura buzurg water supply scheme including survey design site investigation planning supply of all materials labour t p complete in all respect on turn key basis after compl
Read moreof your Industry type