Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Wooden Plain Lining Installation 🔨 The Medical Health And Family Welfare Department Of Uttarakhand Is Seeking Bids From Experienced Contractors For The Installation Of Wooden Plain Lining On Walls, Including All Necessary Hardware Such As Screws, Nuts, Bolts, And Nails. 📅 Bid Submission Deadline: May 9, 2024, 11:00 Am Bidders Must Provide Detailed Quotes, Including Material Specifications And Labor Costs, Along With A Projected Timeline For Project Completion. Keywords: Wooden Plain Lining, Installation, Medical Health And Family Welfare Department, Uttarakhand, Construction Services, Bid Invitation| Particulars | Details |
|---|---|
| Title |
Plywoood Or 12mm On Walls Fixing Plain Lining Whin Necessary Screws Nuts Bolts Nails Including A Co
|
| Description |
|
| Organisation | Medical Health and Family Welfare Department Uttarakhand | |
| Tender Id | GEM/2024/B/4870468 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 18, 2024 15:51 |
| End Date |
Expired
09/05/2024
Expired 889 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Pneumatic rivet gun,chain puller block,caliper hermachrodite,card file steel wire brush,profile gauges,boring bar,dowel pin,standard tap screws,medium carbon heat treated alloy steel metric studs and bolts along with nuts for display of standard length,caps screws,drills guage straight shank,drills guage straight shank,drill gauge,bolt nut and washer set,gear spur,belt v,belt flat,washer clutch keys jib cotter and circlip,lifting sling,swage block 5048,set of rowel punch,conduit pipe cutting and threading machines,conduit pipe bending machine,hacksaw frame,gi pipe bending machine,pvc pipe bending spring,multi scan tool,cylinder liner,plastigauge
Pneumatic rivet gun,chain puller block,caliper hermachrodite,card file steel wire brush,profile gauges,boring bar,dowel pin,standard tap screws,medium carbon heat treated alloy steel metric studs and bolts along with nuts for display of standard length,caps screws,drills guage straight shank,drills guage straight shank,drill gauge,bolt nut and washer set,gear spur,belt v,belt flat,washer clutch keys jib cotter and circlip,lifting sling,swage block 5048,set of rowel punch,conduit pipe cutting and threading machines,conduit pipe bending machine,hacksaw frame,gi pipe bending machine,pvc pipe bending spring,multi scan tool,cylinder liner,plastigauge
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read morePlywoood or 12mm on walls fixing plain lining whin necessary screws nuts bolts nails including a co
Read more
Plywoood or 12mm on walls fixing plain lining whin necessary screws nuts bolts nails including a co
Read more
Plywood water resistant 12mm (size 6ft x 3ft),hexagonal head bolts, screws and nuts of product grad
Read more
Procurement of ss bolts nuts washers screws and studs
Procurement of ss bolts nuts washers screws and studs
Read moreof your Industry type