Tender Details

Particulars Details
Title
Work 1, Construction Work Of Pedestal With Granite Stone Related To Work Details At Various Completed Work Sites In Nagar Palika Parishad, Dadri.
Description
Work 1, Construction Work Of Pedestal With Granite Stone Related To Work Details At Various Completed Work Sites In Nagar Palika Parishad, Dadri.&Amp#X0d
Organisation Directorate of Local Bos UP | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1063
EMD 50000
Tender Value
Place Dadri
Link

AAAAAAAAAA

Login to view
Start Date June 18, 2025 00:25
End Date

25/06/2025 ( 6 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh

Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Repair and replacement of standby dg sets cables along with allied accessories for various e/m installations in tech/ non tech area of tunir and nad, navy nagar, chuna bhati, common area etc at naval station karanja

Repair and replacement of standby dg sets cables along with allied accessories for various e/m installations in tech/ non tech area of tunir and nad, navy nagar, chuna bhati, common area etc at naval station karanja

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to

Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to

Read more
Construction of nala work at in front of divisional commissioner office chaska maska shop to vasundhara apartment in harishankarpuram ward no.58 zone no.13.file no.221/25x3/6.

Construction of nala work at in front of divisional commissioner office chaska maska shop to vasundhara apartment in harishankarpuram ward no.58 zone no.13.file no.221/25x3/6.

Read more
Construction of 06 nos community toilet (sulabh complex) in nagar palika parishad, gadarwara under sbm 2.0

Construction of 06 nos community toilet (sulabh complex) in nagar palika parishad, gadarwara under sbm 2.0

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise