Tender Details

About Tender

🚂 Procurement Opportunity: Coupling Socket Assembly With Locking 🛠️ The Ministry Of Railways, Under The Central Government, Invites Tenders For The Supply Of Coupling Socket Assemblies With Locking Mechanisms. 🔧 📅 Submission Deadline: May 17, 2024, 10:30 Am Tender Fees: Nil Emd: Nil Interested Vendors Must Submit Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules, In Accordance With The Tender Document's Guidelines. Keywords: Coupling Socket Assembly, Locking Mechanism, Ministry Of Railways, Central Government, Tender, Procurement, Railways Infrastructure
Particulars Details
Title
Coupling Socket Assembly With Locking
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106238804
Reference
Number
82241196
Tender Fee 0
EMD 0
Tender Value
Place Bilaspur
Link https://www.ireps.gov.in/ireps/supply/pdfdocs/052024/106332705/viewNitPdf_4555511.pdf
Start Date April 30, 2024 23:13
End Date

17/05/2024 ( Expired 410 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mr pressure injector syringe kit with tubing compatible with bayer mr pressure injector

Procurement of mr pressure injector syringe kit with tubing compatible with bayer mr pressure injector for the dept. of radio-diagnosis, aiims kalyani

Read more
Air brake hose coupling for brake

For complete deion and other details, please refer to tender

Read more
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Rfs for setting up 1200 mw ists-connected spv power projects with 600mw/3600mwh ess (seci-ists-xxi)

Rfs for setting up 1200 mw ists-connected spv power projects with 600mw/3600mwh ess (seci-ists-xxi)

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise