Tender Details
About Tender
๐ Invitation For Track Renewal And Sleeper Replacement Project ๐ ๏ธ The Ministry Of Railways, Central Government, Invites Tenders For A Comprehensive Track Renewal And Sleeper Replacement Project On The Hazipur Section. The Scope Of Work Includes: ๐น Complete Track Renewal (Ctr/P) For Up Line From Km. 548.00 To 548.93 (0.93 T Km.) ๐น Through Rail Renewal (Trr/P) For Dn Line From Km. 551.00 To 552.70 (1.70 T Km.) And Up Line From Km. 724.016 To 725.716 (1.70 T Km.), Km. From 725.716 To 727.416 (1.70 T Km.), Km. From 727.416 To 729.116 (1.70 T Km.), And Km. From 729.116 To 730.53 (1.414 T Km.) ๐น Total Trr(p) = 8.214 T Km. ๐น Through Sleeper Renewal (Tsr/P) For Dn Line From Km. 579.50 To 580.239 (1.78 T Km.) And 643.00 To 644.085 (1.78 T Km.) ๐ Bid Submission Deadline: 2Particulars | Details |
---|---|
Title |
Complete Track Renewal (Ctr/P) Up Line Km. From 548.00 To 548.93= 0.93 T Km. , Through Rail Renewal (Trr/P) Dn Line Km. From 551.00 To 552.70 =1.70 T Km. And Up Line Km.From 724.016 To 725.716= 1.70 T Km., Km. From 725.716 To 727.416 1.70 T Km., Km. From 727.416 To 729.116 = 1.70 T Km., Km. From 729.116 To 730.53 = 1.414 T Km. (Total Trr(p) =8.214 T Km.), Through Sleeper Renewal (Tsr/P) Dn Line Km. 579.50 To 580.239, 643.00 To 644.085 = 1.78 T Km. And Other Ancillary Work Between Pnbe Ddu Section Unde
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73982333 |
Reference Number |
W7ETnder01OpenDNR24-25-2 |
Tender Fee | 0 |
EMD | 2.12 Lakh |
Tender Value | |
Place | Hazipur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/73982333/viewNitPdf_4501863.pdf |
Start Date | May 07, 2024 04:36 |
End Date |
29/05/2024 ( Expired 327 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Re-sagging/re-tensioning work to be done at between various locations of 132kv seoni-pench line, 132 kv gopalganj (tbcb)-pench and 132kv seoni-katangi/lalbarra feeder total 4.463 km through labour contract under ee (eht-maint.) dn., seoni
Re-sagging/re-tensioning work to be done at between various locations of 132kv seoni-pench line, 132 kv gopalganj (tbcb)-pench and 132kv seoni-katangi/lalbarra feeder total 4.463 km through labour contract under ee (eht-maint.) dn., seoni
Read moreComplete track renewal ctr for up bot line old iffco track dn adb line gate no_2 to bauriapalanda and dn main line atbk rob to bauriapalanda
Complete track renewal ctr for up bot line old iffco track dn adb line gate no_2 to bauriapalanda and dn main line atbk rob to bauriapalanda
Read moreThrough rail renewal (primary) along with tfr of existing 60 kg 90 uts rails laid on psc-14 sleeper with new 60 kg 90uts/r260 rails (lwr) for barajamda jn - gua - trr(p) - 4.500 tkm, padapahar - bolanikhadan - trr(p) - 5.500 tkm & padapahar - nayagarh - trr(p) - 28.112 tkm. and 1.595 tr. km on up line at km 331.00 - 332.595 between jnk-tabu section under the jurisdiction of sr.den(south)/ckp.
For complete deion and other details, please refer to tender
Read moreThrough rail renewal (primary) for 11.354 km. from km. 293.162 - km. 400.302 (in patches) on dn. line and complete track renewal (secondary) on loop lines of various yards for 5.557 km. between malligura - kirandul stations under the jurisdiction of sr.den (west)/wat on kk- ii line of waltair division.
For complete deion and other details, please refer to tender
Read moreSw-i- manmad - mudkhed (up/dn) - cess repair - 86700 cum & akola - purna - cess repair - 40000 cum( irpsm id-11.0.31.24.3.53.010 pb no. 157 of fy 2024-25) sw-ii - nanded division - manmad-mudkhed (up& sl) section : ctr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660nos/km density with new 60kg r260 grade rails (lwr) on new wider psc sleepers 1660 nos./km including recoupment and increasing of ballast cushion to 35 cm. and deep screening of ballast for a total length of 15.317 km. (sa
For complete deion and other details, please refer to tender
Read moreHowrah division -trr(p) - 17.417 tkm in locations - bly - bdc up ml 16 - 17.160 = 1.160 km, up ml 18.005 - 21 = 2.995 km, hwh - bly dn ml 6 - 6.200 = 0.200 km, dn ml 8 - 8.431 = 0.431km, rev ml 2.087 - 2.620 = 0.533 km, up ml 6 - 8.660 = 2.660 km hwh - src dn-2 1.099 - 1.665 = 0.566 km , & bly - bdc dn ml 12.915 - 13.385 = 0.470 km, dn ml 13.716 - 15.225 = 1.509 km, dn ml 15.517 - 16.101 = 0.584 km, dn ml 17.134 - 19.400 = 2.266 km, up ml 8.660 - 10.280 = 1.620 km, up ml 11.150 - 11.500 =
For complete deion and other details, please refer to tender
Read more1) vpy-wst section up line: ctr (p) -0.853 km & trr (p) on br. no. 10 r & 16 r -0.047 km 2) ctr(p)-vlk-anng -3.616 km with 60kg /psc/1660 nos/km between km. 0-3.616 in single line
For complete deion and other details, please refer to tender
Read moreUkai songhad -jalgaon section - through sleeper renewal (p) = 15.22 kms and (trr(p) - 3.00 tkm & tsr(p) - 21.640 tkm by contractor s pqrs portal.
For complete deion and other details, please refer to tender
Read moreS&t work in connection with:- (a) mldt division tph-rjl sl trr(p)= 1.29 km & trrp bgp-jmp up 305.112-305.621 = 0.509 km, (b) tinpahar - rajmahal (sl) - tsr(p) - 3.000 tkm, (c) tfr- sl 97.4-114.37=18.97 km in section of mdle-dumka and trr(p) 0.580km in section of bhle-baka, (d) new farakka - malda (up & dn) - tsr(p) - 4.252 tkm, (e) new farakka - malda town (dn) - trr(p) - 0.500 tkm, (f) malda division - ctr(s) - 51.750 tkm, (g) malda division - trr(s) -14.976 tkm, (h) jamalpur - ki
For complete deion and other details, please refer to tender
Read moreSignalling work in conncetion with earth work of construction of important bridge no. 313 up & dn line on new alignment including earthwork, track work and associated civil works (from chainage rly km 188200 to rly km 189 500) between pardi station and atul station in connection with increase of speed to 160 kmph in virar-surat section of mumbai division on western railway.
For complete deion and other details, please refer to tender
Read moreof your Industry type