Tender Details
Particulars | Details |
---|---|
Title |
Complete Track Renewal (Ctr/P) 8.231 Tkm &Amp Trr/P 3.463 T Km Work By Pqrs Between Pnbe Gaya Section Of Aden/Jhd.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72158415 |
Reference Number |
W7ETENDER18OPENDNR23-24-2 |
Tender Fee | 0 |
EMD | 2.25 Lakh |
Tender Value | |
Place | Hazipur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72158415/viewNitPdf_4401817.pdf |
Start Date | December 28, 2023 17:52 |
End Date |
22/01/2024 ( Expired 504 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Water proofing treatment work and p/f of plastic punny at various quarter and bunglow under crp line section indore
Water proofing treatment work and p/f of&#x0d plastic punny at various quarter and&#x0d bunglow under crp line section indore
Read moreG e n e r a l p w d b u i l d i n g s chadayamangalam routine maintenance work of various buildings under chadayamangalam building section from april 2025 for six months
G e n e r a l p w d b u i l d i n g s&#x0d chadayamangalam routine maintenance work&#x0d of various buildings under chadayamangalam&#x0d building section from april 2025 for six&#x0d months
Read moreOthers-hiring of 1 number of vehicle having cubic capacity 1000 to 1500 cc-on contract basis-dry lease without driver for the use of p. h. section, guruvayoor for six months or for 9500 km whichever comes first-general civil work
Others-hiring of 1 number of vehicle having&#x0d cubic capacity 1000 to 1500 cc-on contract&#x0d basis-dry lease without driver for the use of&#x0d p. h. section, guruvayoor for six months or for&#x0d 9500 km whichever comes first-general civil&#x0d work
Read moreConstruction of passenger lounge at various locations in malappuram lac , work proposed. by honble mla sri p. ubaidulla, lac-ads (project no.19493)
Construction of passenger lounge at various&#x0d locations in malappuram lac , work&#x0d proposed. by honble mla sri p. ubaidulla,&#x0d lac-ads (project no.19493)
Read moreRepair of drain from house number p-18 of mr. prakash chandra gupta to mr. manoj house in hariparvat zone, room no. 34, lawyers colony, interlocking tiles and cc on the side track. road improvement work by.
Repair of drain from house number p-18 of mr. prakash chandra gupta to mr. manoj house in hariparvat zone, room no. 34, lawyers colony, interlocking tiles and cc on the side track. road improvement work by.
Read moreSouth central railway construction organization-engineering, procurement and construction (epc) contract for doubling of track between manyamkonda station (excl)& perur station(incl) from km 128.200 to km 156.700(28.500 km) including electrification & signaling works in connection with doubling of mahabubnagar-dhone section in the state of telangana.
For complete deion and other details, please refer to tender
Read moreFirst class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
First class brick lining work 1 3 cm in mawai minor from chainage 0.725 to 1.075 at kundakala pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as direc
Read moreBank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Bank protection work of river bank right side of barge from 0.00 to 22.50 m at balua pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by e
Read moreStrenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p
Strenthaning of uruwa minor by renovation of old brick lining 1 4 c.m. in between 0.000 km to 0.850 km at reruwa pump canal including all cost of material, (excluding cement and brick ) labour, t and p used, complete in all respect as per drawing p
Read moreGeneral-bm rectification and bc renewal between km 247/370 to 248/700 of old nh 66 -pushpa junction to panniyankara-general civil work
General-bm rectification and bc renewal&#x0d between km 247/370 to 248/700 of old nh 66&#x0d -pushpa junction to panniyankara-general civil&#x0d work
Read moreof your Industry type