Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Raising The Rcc Wall In The North Side Of Cooling Water Open Channel 2 Ch 450 Mtr To 590 Mtr In Stage 3 Area
|
| Description |
Raising The Rcc Wall&Amp#X0d
In The North Side Of Cooling Water Open Channel 2 Ch 450 Mtr To 590 Mtr In Stage 3 Area
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_409726_1 |
|
Reference Number |
CE SE C TTPS Spec No. 248 23 24 |
| Tender Fee | 0 |
| EMD | 20700 |
| Tender Value | |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=487490 |
| Start Date | January 13, 2024 14:30 |
| End Date |
Expired
19/01/2024
Expired 898 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreCharter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.
Charter hire of 2 two nos of dp 3 drillship modu package with equipment and crew for drilling, testing and abandonment of exploratory wells in water depths from 500 meters to 3000 meters.
Read moreRaising the rcc wall in the north side of cooling water open channel 2 ch 300 mtr to 450 mtr in stage 3 area
Raising the rcc wall&#x0d in the north side of cooling water open channel 2 ch 300 mtr to 450 mtr in stage 3 area
Read moreRaising the rcc wall in the north side of cooling water open channel 2 ch 0 mtr to 150 mtr in stage 3 area
Raising the rcc wall in the north side of cooling water open channel 2 ch 0 mtr to 150 mtr in stage 3 area
Read moreRaising the rcc wall in the north side of cooling water open channel 2 ch 150 mtr to 300 mtr in stage 3 area
Raising the rcc wall&#x0d in the north side of cooling water open channel 2 ch 150 mtr to 300 mtr in stage 3 area
Read moreRaising the rcc wall in the south side of cooling water open channel 2 ch 477.50 mtr to 590 mtr in stage 3 area
Raising the rcc wall in the south side of cooling water open channel 2 ch 477.50 mtr to 590 mtr in stage 3 area
Read moreRaising the rcc wall in the south side of cooling water open channel 2 ch 0 mtr to 67.50 mtr in stage 3 area
Raising the rcc wall&#x0d in the south side of cooling water open channel 2 ch 0 mtr to 67.50 mtr in stage 3 area
Read moreRaising the rcc wall in the south side of cooling water open channel 2 ch 67.50 mtr to 297.50 mtr in stage 3 area
Raising the rcc wall&#x0d in the south side of cooling water open channel 2 ch 67.50 mtr to 297.50 mtr in stage 3 area
Read moreRaising the rcc wall in the north side of cooling water closed channel 2 from eastern side compound wall ch 300 mtr to 450 mtr reach 3
Raising the rcc wall&#x0d in the north side of cooling water closed channel 2 from eastern side compound wall ch 300 mtr to 450 mtr reach 3
Read moreRaising the rcc wall in the north side of cooling water closed channel 2 from eastern side compound wall ch 450 mtr to 600 mtr reach 4
Raising the rcc wall&#x0d in the north side of cooling water closed channel 2 from eastern side compound wall ch 450 mtr to 600 mtr reach 4
Read moreof your Industry type