| Particulars | Details |
|---|---|
| Title |
Raising The Rcc Wall In The North Side Of Cooling Water Open Channel 2 Ch 0 Mtr To 150 Mtr In Stage 3 Area
|
| Description |
Raising The Rcc Wall In The North Side Of Cooling Water Open Channel 2 Ch 0 Mtr To 150 Mtr In Stage 3 Area
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_409680_1 |
|
Reference Number |
CE SE Civil TTPS Spec.No.245 23 24 |
| Tender Fee | 0 |
| EMD | 22200 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=487430 |
| Start Date | January 13, 2024 14:30 |
| End Date |
Expired
19/01/2024
Expired 999 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General-gps ii 2026-27-modernisation of field channel-offtaking from tail end of nandankizhaya branch canal bet. ch 0/000km and ch.0/150 km.-general civil work
Cada rectification works
Read moreEstimate for laying underground rcc pipeline from rd 225 to 350 m of direct outlet at rd 87528r mtr of kandi canal stage 2 hoshiarpur
Estimate for laying underground rcc pipeline from rd 225 to 350 m of direct outlet at rd 87528r mtr of kandi canal stage 2 hoshiarpur
Read more8port gigabit poe switch with 2 sfp port,sfp module,16 port sfp 10g switch,4u rack out door,6 core optical fibre in mtr,3 core 4.0 sq mm power cable,hdpe pipe 40mm,fibre termination box,cat6 wire roll,fibre patch cord,4mp 30 mtr dome camera,4mp 150 mtr ptz camera,4mp 60 mtr bullet camera,connector,32 ch 2 sata nvr,64 ch 8 sata nvr,16 ch nvr,43led tv,32 led tv,10 tb hdd,hdmi cable 30 mtr,hdmi cable 2 mtr,root marker,installation charges including grounding and wiring
8port gigabit poe switch with 2 sfp port,sfp module,16 port sfp 10g switch,4u rack out door,6 core optical fibre in mtr,3 core 4.0 sq mm power cable,hdpe pipe 40mm,fibre termination box,cat6 wire roll,fibre patch cord,4mp 30 mtr dome camera,4mp 150 mtr ptz camera,4mp 60 mtr bullet camera,connector,32 ch 2 sata nvr,64 ch 8 sata nvr,16 ch nvr,43led tv,32 led tv,10 tb hdd,hdmi cable 30 mtr,hdmi cable 2 mtr,root marker,installation charges including grounding and wiring
Read moreNctps ii civil maintenance circle civil maintenance division construction of rcc retaining wall to avoid earth slip near the northern side of the cooling water intake structure from ch 0 00m to ch 15 50m and clearing of heavy jungle on ei
Nctps ii civil maintenance circle civil maintenance division construction of rcc retaining wall to avoid earth slip near the northern side of the cooling water intake structure from ch 0 00m to ch 15 50m and clearing of heavy jungle on ei
Read moreConstruction of gopalpura mataji to singhpura service road ch. 289/100 to 289/800 bhs length (650 mtr.) and for rcc crash barrier and safety work from km 263/160 to km 306/700 on nh-52 in the state of rajasthan
Construction of gopalpura mataji to singhpura service road ch. 289/100 to 289/800 bhs length (650 mtr.) and for rcc crash barrier and safety work from km 263/160 to km 306/700 on nh-52 in the state of rajasthan
Read moreBadhal khul restoration and structural rehabilitation of l khul by construction of rcc covered channel section from rd 25 to 30 m providing cement concrete retaining walls and or parapet walls 136 from rd 55 to 150 m rd 160 to 210 m and rd 250 to 280
Badhal khul restoration and structural rehabilitation of l khul by construction of rcc covered channel section from rd 25 to 30 m providing cement concrete retaining walls and or parapet walls 136 from rd 55 to 150 m rd 160 to 210 m and rd 250 to 280
Read moreRaising the rcc wall in the north side of cooling water open channel 2 ch 150 mtr to 300 mtr in stage 3 area
Raising the rcc wall&#x0d in the north side of cooling water open channel 2 ch 150 mtr to 300 mtr in stage 3 area
Read moreRaising the rcc wall in the north side of cooling water open channel 2 ch 300 mtr to 450 mtr in stage 3 area
Raising the rcc wall&#x0d in the north side of cooling water open channel 2 ch 300 mtr to 450 mtr in stage 3 area
Read moreRaising the rcc wall in the north side of cooling water open channel 2 ch 450 mtr to 590 mtr in stage 3 area
Raising the rcc wall&#x0d in the north side of cooling water open channel 2 ch 450 mtr to 590 mtr in stage 3 area
Read moreRaising the rcc wall in the south side of cooling water open channel 2 ch 477.50 mtr to 590 mtr in stage 3 area
Raising the rcc wall in the south side of cooling water open channel 2 ch 477.50 mtr to 590 mtr in stage 3 area
Read moreof your Industry type