Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Raising The Rcc Wall In The North Side Of Cooling Water Open Channel 2 Ch 300 Mtr To 450 Mtr In Stage 3 Area
|
| Description |
Raising The Rcc Wall&Amp#X0d
In The North Side Of Cooling Water Open Channel 2 Ch 300 Mtr To 450 Mtr In Stage 3 Area
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_409717_1 |
|
Reference Number |
CE SE Civil TTPS Spec.No.247 23 24 |
| Tender Fee | 0 |
| EMD | 22200 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=487477 |
| Start Date | January 13, 2024 14:30 |
| End Date |
Expired
19/01/2024
Expired 999 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Modernization of field channel offtakes from the ch 3 300 km lhs of no 3 distributary canal para karimbiyankode field channel in between ch 0 030 km to 0 190 km ch 0.300 km to ch 0 550 km 1080
Modernization of field channel offtakes from the ch 3.300 km lhs of no.3 distributary canal para karimbiyankode field channel in between ch 0.030 km to 0.190 km ch 0.300 km to ch 0.550 km 1080.
Read moreGeneral sabarimala festival 2026 27 improvements to footpath in gothuruth road ch 0 000 to ch1 450 providing bm patch and bc overlay to footpath in gothuruth road ch 0 000 to ch1 450 under north paravur sectiongeneral civil work
The estimate includes the required items for pavement strengthening, drainage and allied works, including bm, bc, m15, m20 concrete works for drain and traffic safety provisions
Read moreGeneral sabarimala festival 2026 27 improvements to kongorpilly olanad roadproviding bm patch and bc overlay to kongorpilly olanad road ch 0 000 to ch 1 300 under north paravur roads section general civil work
Items included in this estimate are scarifying wmm m40 interlock tiles bm bc m15 m20 concrete hysd steel etc
Read more4 mp image stablizer based ir ptz 30 x camera,5 mp ir varifocal bullet network camera id 10 oblique ip66,8 channel nvr with 4 terabyte surveillance hdd with monitor,poe switch 8 port 150w 250mts,outdoor all weather cat 6 cable 300 mtr roll,power cable 2 point 5 sqmm 3 core,5 kva online ups
4 mp image stablizer based ir ptz 30 x camera,5 mp ir varifocal bullet network camera id 10 oblique ip66,8 channel nvr with 4 terabyte surveillance hdd with monitor,poe switch 8 port 150w 250mts,outdoor all weather cat 6 cable 300 mtr roll,power cable 2 point 5 sqmm 3 core,5 kva online ups
Read moreRaising the rcc wall in the north side of cooling water open channel 2 ch 450 mtr to 590 mtr in stage 3 area
Raising the rcc wall&#x0d in the north side of cooling water open channel 2 ch 450 mtr to 590 mtr in stage 3 area
Read moreRaising the rcc wall in the north side of cooling water open channel 2 ch 150 mtr to 300 mtr in stage 3 area
Raising the rcc wall&#x0d in the north side of cooling water open channel 2 ch 150 mtr to 300 mtr in stage 3 area
Read moreRaising the rcc wall in the north side of cooling water open channel 2 ch 0 mtr to 150 mtr in stage 3 area
Raising the rcc wall in the north side of cooling water open channel 2 ch 0 mtr to 150 mtr in stage 3 area
Read moreRaising the rcc wall in the north side of cooling water closed channel 2 from eastern side compound wall ch 300 mtr to 450 mtr reach 3
Raising the rcc wall&#x0d in the north side of cooling water closed channel 2 from eastern side compound wall ch 300 mtr to 450 mtr reach 3
Read moreRaising the rcc wall in the south side of cooling water open channel 2 ch 477.50 mtr to 590 mtr in stage 3 area
Raising the rcc wall in the south side of cooling water open channel 2 ch 477.50 mtr to 590 mtr in stage 3 area
Read moreRaising the rcc wall in the south side of cooling water open channel 2 ch 0 mtr to 67.50 mtr in stage 3 area
Raising the rcc wall&#x0d in the south side of cooling water open channel 2 ch 0 mtr to 67.50 mtr in stage 3 area
Read moreof your Industry type