Tender Details

Particulars Details
Title
Mtps I Tm Unit Iv Overhauling And Flange Gasket Renewing Of Valves In Heater Drain Pegging Steam To Deaerator Condenser Air Auxiliary Steam And Drain Water Lines And Gasket Renewing Of Valves In Unit Iv During Aoh 2024 25
Description
Mtps I Tm Unit Iv Overhauling And Flange Gasket Renewing Of Valves In Heater Drain Pegging Steam To Deaerator Condenser Air Auxiliary Steam And Drain Water Lines And Gasket Renewing Of Valves In Unit Iv During Aoh 2024 25
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_463876_1
Reference
Number
CE / MTPS-I / SE / M-I / TM / OT. 110 / 2024-25
Tender Fee 0
EMD 5300
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=551328
Start Date July 18, 2024 22:30
End Date

24/07/2024 ( Expired 272 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha

Thermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha

Read more
Supply of certain spares for bhel make motor operated valves installed in feed water path and deaerator and hp heater extraction lines

Supply of certain spares for bhel make motor operated valves installed in feed water path and deaerator and hp heater extraction lines

Read more
Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026-reg

Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026

Read more
High pressure water jet cleaning of condenser tubes and lube oil cooler tubes 2 sets in coming overhauling of unit 1 at stg i sgtpp during aug 2025 sgtpp

High pressure water jet cleaning of condenser tubes and lube oil cooler tubes 2 sets in coming overhauling of unit 1 at stg i sgtpp during aug 2025 sgtpp

Read more
Mtps i m ii oahs fam pdfacs unit iv attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reassem

Mtps i m ii oahs fam pdfacs unit iv attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reassem

Read more
Mtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c

Mtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Read more
Mtps i mill plant centralised ac plant attending breakdown works in ac compressor no 2 and 3 ac cooling tower fans air handling units air washer system circulating water pumps pipe lines and valves etc for a period of 365 days

Mtps i mill plant centralised ac plant attending breakdown works in ac compressor no 2 and 3 ac cooling tower fans air handling units air washer system circulating water pumps pipe lines and valves etc for a period of 365 days

Read more
Ttps mech ii ahp unit i ii iii breakdown works in ash water pump house overhauling of bottom ash water pump high pressure water pump low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26

Ttps mech ii ahp unit i ii iii breakdown works in ash water pump house overhauling of bottom ash water pump high pressure water pump low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26

Read more
Ttps mech ii ahp unit i ii iii breakdown work in ash slurry pump house equipments overhauling of ash slurry pump seal water pump and suction delivery valves for the period from 01 04 2025 to 31 03 2026

Ttps mech ii ahp unit i ii iii breakdown work in ash slurry pump house equipments overhauling of ash slurry pump seal water pump and suction delivery valves for the period from 01 04 2025 to 31 03 2026

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise