Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit Iv Overhauling And Flange Gasket Renewing Of Valves In Heater Drain Pegging Steam To Deaerator Condenser Air Auxiliary Steam And Drain Water Lines And Gasket Renewing Of Valves In Unit Iv During Aoh 2024 25
|
Description |
Mtps I Tm Unit Iv Overhauling And Flange Gasket Renewing Of Valves In Heater Drain Pegging Steam To Deaerator Condenser Air Auxiliary Steam And Drain Water Lines And Gasket Renewing Of Valves In Unit Iv During Aoh 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_463876_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM / OT. 110 / 2024-25 |
Tender Fee | 0 |
EMD | 5300 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=551328 |
Start Date | July 18, 2024 22:30 |
End Date |
24/07/2024 ( Expired 272 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Read moreSupply of certain spares for bhel make motor operated valves installed in feed water path and deaerator and hp heater extraction lines
Supply of certain spares for bhel make motor operated valves installed in feed water path and deaerator and hp heater extraction lines
Read moreKtps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026-reg
Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026
Read moreHigh pressure water jet cleaning of condenser tubes and lube oil cooler tubes 2 sets in coming overhauling of unit 1 at stg i sgtpp during aug 2025 sgtpp
High pressure water jet cleaning of condenser tubes and lube oil cooler tubes 2 sets in coming overhauling of unit 1 at stg i sgtpp during aug 2025 sgtpp
Read moreMtps i m ii oahs fam pdfacs unit iv attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reassem
Mtps i m ii oahs fam pdfacs unit iv attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reassem
Read moreMtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c
Mtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreMtps i mill plant centralised ac plant attending breakdown works in ac compressor no 2 and 3 ac cooling tower fans air handling units air washer system circulating water pumps pipe lines and valves etc for a period of 365 days
Mtps i mill plant centralised ac plant attending breakdown works in ac compressor no 2 and 3 ac cooling tower fans air handling units air washer system circulating water pumps pipe lines and valves etc for a period of 365 days
Read moreTtps mech ii ahp unit i ii iii breakdown works in ash water pump house overhauling of bottom ash water pump high pressure water pump low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26
Ttps mech ii ahp unit i ii iii breakdown works in ash water pump house overhauling of bottom ash water pump high pressure water pump low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26
Read moreTtps mech ii ahp unit i ii iii breakdown work in ash slurry pump house equipments overhauling of ash slurry pump seal water pump and suction delivery valves for the period from 01 04 2025 to 31 03 2026
Ttps mech ii ahp unit i ii iii breakdown work in ash slurry pump house equipments overhauling of ash slurry pump seal water pump and suction delivery valves for the period from 01 04 2025 to 31 03 2026