Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit Ii Overhauling And Flange Gasket Renewing Of Valves In Heater Drain Pegging Steam To Deaerator Condenser Air Auxiliary Steam And Drain Water Lines And Gasket Renewing Of Valves In Unit Ii During Coh 2024 25
|
Description |
Mtps I Tm Unit Ii Overhauling And Flange Gasket Renewing Of Valves In Heater Drain Pegging Steam To Deaerator Condenser Air Auxiliary Steam And Drain Water Lines And Gasket Renewing Of Valves In Unit Ii During Coh 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_489060_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 185 / 2024-25 |
Tender Fee | 0 |
EMD | 14100 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=581135 |
Start Date | September 27, 2024 22:30 |
End Date |
11/10/2024 ( Expired 260 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant ac plant unit iii aoh 2025 26 air washer system epoxy painting of blowers and its auxiliaries enamel painting of awcw pumps pipe lines spray nozzles flushing works overhauling the blower 3a 3b damper box awcw pumps and gate valves
Mtps i mill plant ac plant unit iii aoh 2025 26 air washer system epoxy painting of blowers and its auxiliaries enamel painting of awcw pumps pipe lines spray nozzles flushing works overhauling the blower 3a 3b damper box awcw pumps and gate valves
Read moreTtps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Ttps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Read moreMtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Read moreNctps i es circle em i dn s dn i annual maintenance works in generator transformers unit auxiliary transformers and station transformers of unit i ii iii during the annual capital overhauling period for the year 2025 26 at nctps i
Nctps i es circle em i dn s dn i annual maintenance works in generator transformers unit auxiliary transformers and station transformers of unit i ii iii during the annual capital overhauling period for the year 2025 26 at nctps i
Read moreMtps i o ahs bah stage i overhauling of scrapper feeders 2a2 and 2b1 in bottom ash hopper unit ii and also fabrication of 300nb economizer hopper
Mtps i o ahs bah stage i overhauling of scrapper feeders 2a2 and 2b1 in bottom ash hopper unit ii and also fabrication of 300nb economizer hopper
Read moreMtps i oahs bahstage i overhauling of scrapper feeders 1a1 1b1 in bottom ash hopper unit i and also fabrication of 300nb economizer hopper drain line bend for unit i
Mtps i oahs bahstage i overhauling of scrapper feeders 1a1 1b1 in bottom ash hopper unit i and also fabrication of 300nb economizer hopper drain line bend for unit i
Read moreMtps i tm unit i overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit i aoh 2025 26
Mtps i tm unit i overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit i aoh 2025 26
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15
Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15
Read moreMtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26
Mtps i tm i unit iii inspection and overhauling of oil vapour extraction fan assembly and soc coolers during 2025 26
Read moreof your Industry type