Tender Details

Particulars Details
Title
Mtps I Tm Unit Iv Overhauling And Flange Gasket Renewing Of Valves In Heater Drain Pegging Steam To Deaerator Condenser Air Auxiliary Steam And Drain Water Lines And Gasket Renewing Of Valves In Unit Iv During Aoh 2025 26
Description
Mtps I Tm Unit Iv Overhauling And Flange Gasket Renewing Of Valves In Heater Drain Pegging Steam To Deaerator Condenser Air Auxiliary Steam And Drain Water Lines And Gasket Renewing Of Valves In Unit Iv During Aoh 2025 26
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_588766_1
Reference
Number
CE / MTPS-I / SE / M-I / TM / OT.223/ 2025-26
Tender Fee 0
EMD 6400
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=703363

Start Date August 04, 2025 21:30
End Date
Expired 18/08/2025

Expired 422 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27

Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27

Read more
Ttps mechii tm i unitiii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during the forthcoming annual overhaul

Ttps mechii tm i unitiii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during the forthcoming annual overhaul

Read more
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii

Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii

Read more
Mtpsi tm unit ii annual overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines in unit ii during annual overhauling 2026 27

Mtpsi tm unit ii annual overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines in unit ii during annual overhauling 2026 27

Read more
Mtps i tm unit ii carrying out bullet cleaning by specially designed phosphor bronze bullet shot of lhs and rhs of condenser tubes in condenser during aoh of 2026 27

Mtps i tm unit ii carrying out bullet cleaning by specially designed phosphor bronze bullet shot of lhs and rhs of condenser tubes in condenser during aoh of 2026 27

Read more
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of boiler drum and all safety valves and allied works

Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of boiler drum and all safety valves and allied works

Read more
Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main

Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main

Read more
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul

Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul

Read more
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027

Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027

Read more
Ttps mechii tm i unitiii inspection overhauling renewal of piston seals piston rod packings in hplp bypass valves spray valves actuators condenser butterfly valves actuators and steam line valves actuators for main turbine system feed water syst

Ttps mechii tm i unitiii inspection overhauling renewal of piston seals piston rod packings in hplp bypass valves spray valves actuators condenser butterfly valves actuators and steam line valves actuators for main turbine system feed water syst

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise