Tender Details
Particulars | Details |
---|---|
Title |
Dismantling And Repairing Of 03 Nos. Old Pontoon And Fabrication Of 03 Nos. New Pontoon With Commissioning Of Pump And Motor Including Shading, Drum Pontoon And Fabrication Of Drum Pontoons During Monsoon 2025 26 (Monsoon Activity No. 04 ) In Kakri
|
Description |
Dismantling And Repairing Of 03 Nos. Old Pontoon And Fabrication Of 03 Nos. New Pontoon With Commissioning Of Pump And Motor Including Shading, Drum Pontoon And Fabrication Of Drum Pontoons During Monsoon 2025 26 (Monsoon Activity No. 04 ) In Kakri
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_331564_1 |
Reference Number |
NCL/KKR/ENM/Tender/2024-25/366 |
Tender Fee | 0 |
EMD | 10800 |
Tender Value | |
Place | NCL KAKRI PROJECT |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343711 |
Start Date | March 08, 2025 15:30 |
End Date |
18/03/2025 ( Expired 77 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Running and maintenance of swtp at jatanbari / s.h-1.20 mgd surface water treatment plant at jatanbari nutan bazaar/ repairing and rewinding of v.t pump/motor under the jurisdiction of dws sub-division, karbook, gomati, tripura during the year 2025-2
Running and maintenance of swtp at jatanbari / s.h-1.20 mgd surface water treatment plant at jatanbari nutan bazaar/ repairing and rewinding of v.t pump/motor under the jurisdiction of dws sub-division, karbook, gomati, tripura during the year 2025-2
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Read moreSupply, erection, commissioning of new low head type pan capacity 60 ton (heating surface 277.5 mtr. sq.) complete calendria with s.s. tubes fitting and hydraulic testing with bottom saucer and all accessories for season 2025-26
Supply, erection, commissioning of new low head type pan capacity 60 ton (heating surface 277.5 mtr. sq.) complete calendria with s.s. tubes fitting and hydraulic testing with bottom saucer and all accessories for season 2025-26
Read moreChhatter - supply, erection and commissioning of v.t. pumps of 05 cs. discharge capacity along with shaft motor of 30 hp fully transformer type er suitable for 30 hp motor alongwith 03 nos. air break contractor 50 amp, 40 amp, 30 amp and mccb 10
Chhatter - supply, erection and commissioning of v.t. pumps of 05 cs. discharge capacity along with shaft motor of 30 hp fully transformer type er suitable for 30 hp motor alongwith 03 nos. air break contractor 50 amp, 40 amp, 30 amp and mccb 10
Read moreDesign engineering supply of materials equipment erection testing and commissioning of 04 nos 220 kv bays at ttps switchyard along with dismantling loading and unloading transportation of existing damaged equipment from site store of tvnl on turnkey
Design engineering supply of materials equipment erection testing and commissioning of 04 nos 220 kv bays at ttps switchyard along with dismantling loading and unloading transportation of existing damaged equipment from site store of tvnl on turnkey
Read moreMtc of different m i schemes under w r sub division amarpur gomati tripura repairing of pump motor suction delivery and other allied works etc at different l i schemes within ompi rd block area during the year 2025 26 2nd call
Mtc of different m i schemes under w r sub division amarpur gomati tripura repairing of pump motor suction delivery and other allied works etc at different l i schemes within ompi rd block area during the year 2025 26 2nd call
Read more(1) making of 04 nos. of motor dala end cover and 04 nos.bearing grease cap of at akwmc for 150hp and 167 hp.(2) fabrication of base plate h.t pump motor to be installed at ocp pump.(3) dismantling of 3000 gpm pump flow more an
(1) making of 04 nos. of 
 motor dala end cover and 
 04 nos.bearing grease cap 
 of at akwmc for 150hp and 
 167 hp.(2) fabrication of 
 base plate h.t pump motor 
 to be installed at ocp 
 pump.(3) dismantling of 
 3000 gpm pump flow more an
Read moreNit no 03 /bag/2025-26 date 23.05.2025 sl 4
Installation of single armed solar street light at chandpur two para, mandra and saidpur old samsad- xv, new sansad xvii/18 jl- 39, mouza- chandpur (6 nos light)
Read moreDismantling and transporting of damaged drum pontoon from main patch to f/b for repair and transporting fresh pontoon from f/b to main patch and installation of 3000gpm pump on the pontoon with di its existing pipeline at phularitand, ampc.
Dismantling and transporting of damaged drum pontoon from main patch to f/b for repair and transporting fresh pontoon from f/b to main patch and installation of 3000gpm pump on the pontoon with di its existing pipeline at phularitand, ampc.
Read moreof your Industry type