Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Different Size Of Valves And Fabrication Of Universal Joints During Monsoon 2025 26 Monsoon Activity No.08 In Kakri Project
|
| Description |
Repairing Different Size Of Valves And Fabrication Of Universal Joints During Monsoon 2025 26 Monsoon Activity No.08 In Kakri Project
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_330166_1 |
|
Reference Number |
NCL/KKR/ENM/Tender/2025-26/353 |
| Tender Fee | 0 |
| EMD | 4500 |
| Tender Value | - |
| Place | NCL, KAKRI PROJECT |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342249 |
| Start Date | February 26, 2025 15:30 |
| End Date |
Expired
08/03/2025
Expired 586 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of different types of gland packing bonnet seal and spiral wound gasket of hp valves to be utilized during unit 4 oh
Procurement of different types of gland packing bonnet seal and spiral wound gasket of hp valves to be utilized during unit 4 oh
Read moreProcurement of different types of gland packing bonnet seal and spiral wound gasket of hp valves to be utilized during unit 4 oh
Procurement of different types of gland packing bonnet seal and spiral wound gasket of hp valves to be utilized during unit 4 oh
Read moreProviding and installation of different dia butterfly and sluice valves at 3 mgd wtp at collegetilla pragati wtp and different oht within the jurisdiction of dws sub-division no i collegetilla agartala during the year 2026 27
Providing and fitting fixing of butterfly valves of different dia sluice valves construction and mtc of sluice valve chambers mtc of different sluice valve etc within the jurisdiction of dws sub division no collegetilla agartala during the year 202
Read moreProviding, fabrication and construction of copper plate earthing as per drawing details of electrodes and earth pit at akashvani leh, ladakh,providing and interconnecting earth electrodes with providing, fabrication and fixing of 25mm x 3mm copper strip at akashvani leh, ladakh,providing of 25x3mm copper strip for extension of earthing system up to the transmitter hall, ups and lt panel in premises at akashvani leh, ladakh,laying of 25 mm x 3 mm copper strip from earthing system to bus bars and jointing the all joints and connections of ends of copper strips by copper riveting and brazing at akashvani leh, ladakh,providing of 375x38x6mm copper bus bar with insulators and steel nut bolts and fixing of 375x38x6mm copper bus bar is to be done to terminate the different earthing system at akashvani leh, ladakh,providing and fixing of nomenclature sign marker for earth pits at akashvani leh, ladakh
Providing, fabrication and construction of copper plate earthing as per drawing details of electrodes and earth pit at akashvani leh, ladakh,providing and interconnecting earth electrodes with providing, fabrication and fixing of 25mm x 3mm copper strip at akashvani leh, ladakh,providing of 25x3mm copper strip for extension of earthing system up to the transmitter hall, ups and lt panel in premises at akashvani leh, ladakh,laying of 25 mm x 3 mm copper strip from earthing system to bus bars and jointing the all joints and connections of ends of copper strips by copper riveting and brazing at akashvani leh, ladakh,providing of 375x38x6mm copper bus bar with insulators and steel nut bolts and fixing of 375x38x6mm copper bus bar is to be done to terminate the different earthing system at akashvani leh, ladakh,providing and fixing of nomenclature sign marker for earth pits at akashvani leh, ladakh
Read moreRepairing different size of valves and fabrication of universal joints during monsoon 2024-25 (monsoon activity no.08) in kakri project.
Repairing different size of valves and fabrication of universal joints during monsoon 2024-25 (monsoon activity no.08) in kakri project.
Read moreErection of earth pit and lighting arrester during monsoon 2025-26 (monsoon activity no.5) at kakri
Erection of earth pit and lighting arrester during monsoon 2025-26 (monsoon activity no.5) at kakri
 project.
Read moreErection of earth pit and lighting arrester during monsoon 2025-26 (monsoon activity no.5) at kakri
Erection of earth pit and lighting arrester during monsoon 2025-26 (monsoon activity no.5) at kakri
 project
Read moreFabrication of universal joints for floating pumps, repairing of nrv/foot valve/sluice valves of different sizes, bends and strainers for monsoon 25-26 at block-b project.
Fabrication of universal joints for floating pumps, repairing of nrv/foot valve/sluice valves of different sizes, bends and strainers for monsoon 25-26 at block-b project.
Read moreRepairing of lt ers, motor, field switches, transformer etc during monsoon 2024-25 (monsoon activity no.06) in kakri project.
Repairing of lt ers, motor, field switches, transformer etc during monsoon 2024-25 (monsoon activity no.06) in kakri project.
Read moreRepairing of lt ers, motor, field switches, transformer etc during monsoon 2024-25 (monsoon activity no.06) in kakri project.
Repairing of lt ers, motor, field switches, transformer etc during monsoon 2024-25 (monsoon activity no.06) in kakri project.
Read moreof your Industry type