Tender Details
Particulars | Details |
---|---|
Title |
Upgradation Of Lt Electric Sub Station Along With Installation Of On Load Tap Changer Transformer And Allied Works At Cps Boria Under Amrut 2.0
|
Description |
Upgradation Of Lt Electric Sub Station Along With Installation Of On Load Tap Changer Transformer And Allied Works At Cps Boria Under Amrut 2.0
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2025_PHE_274791_1 |
Reference Number |
PHEJ/MS/96 of 2024-25 Dated 24-03-2025 |
Tender Fee | 2000 |
EMD | 0 |
Tender Value | |
Place | Jammu |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=847518 |
Start Date | April 04, 2025 15:30 |
End Date |
21/04/2025 ( Expired 23 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreAAAAAAAAAA
Login to viewSupply, delivery and installation overhead pole at para water supply scheme (intake site) and other allied works under pmd, phe dte.
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConst. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Read moreSupply, installation, testing, commissioning of hospital laundy equipment on turnkey basis with 02 years comprehensive warranty on buy-back basis and operation of laundry services for a period of 10 years at aiims, new delhi
Tender for supply, installation, testing, and
 commissioning of hospital laundry equipment on
 turnkey basis with 02 years comprehensive
 warranty on buy-back basis and operation of
 laundry services for a period of 10 years at aiims.
Read moreInterception and di of nallahs with stp works project of bijawar town under sbm 2.0
Interception and di of nallahs with stp works project of bijawar town under sbm 2.0
Read moreConstruction of revetment of tower no 37 of 132 kv jwalapur-roorkee line associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no 37 of 132 kv jwalapur-roorkee line associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreConstruction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreof your Industry type