Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transporting, Shifting And Changing Of Different Size Motors Of 51 Bc, 40 Bc, Bc 04, Bc 05, Bc 07, Transfer Bc, Secondary Crusher, Impact Crusher, Clean Coal Shuttle Bc, S 1 Screen Welding Machine Of P.C.H. And Deshaling Plant And Dismantling And Modif
|
| Description |
Transporting, Shifting And Changing Of Different Size Motors Of 51 Bc, 40 Bc, Bc 04, Bc 05, Bc 07, Transfer Bc, Secondary Crusher, Impact Crusher, Clean Coal Shuttle Bc, S 1 Screen Welding Machine Of P.C.H. And Deshaling Plant And Dismantling And Modif
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_338298_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/25-26/22 Date 24.06.2025 |
| Tender Fee | 0 |
| EMD | 3700 |
| Tender Value | - |
| Place | Office of the Project Officer, Sawang Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=350681 |
| Start Date | June 25, 2025 16:30 |
| End Date |
Expired
04/07/2025
Expired 433 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, transporting, shifting, replacement and installation of different size motors and changing of motor base for middling coal shuttle conveyor, clean coal conveyor, bc-8, impact crusher, bc-1, 51bc, bc-2, feeder, s-1 screen, primary crusher
Dismantling, transporting, shifting, replacement and installation of different size motors and changing of motor base for middling coal shuttle conveyor, clean coal conveyor, bc-8, impact crusher, bc-1, 51bc, bc-2, feeder, s-1 screen, primary crusher
Read moreRepairing of different chain sprocket of different belt conveyor of main plant (40bc, 51bc by pass bc slurry bc, middling coal bc, clean coal bc, clean coal shuttle bc, middling coal shuttle bc, stockpile bc and shuttle wheel track line etc. in main
Repairing of different chain sprocket of different belt conveyor of main plant (40bc, 51bc by pass bc slurry bc, middling coal bc, clean coal bc, clean coal shuttle bc, middling coal shuttle bc, stockpile bc and shuttle wheel track line etc. in main
Read moreFabrication / erection of top roller frame of different belt conveyors 40bc, 51bc by pass bc, slurry bc, clean coal, middling coal bc and clean coal, middling coal shuttle bc etc. work in main plant of sawang washery for a period of 06 months.
Fabrication / erection of top roller frame of different belt conveyors 40bc, 51bc by pass bc, slurry bc, clean coal, middling coal bc and clean coal, middling coal shuttle bc etc. work in main plant of sawang washery for a period of 06 months.
Read moreDismantling, changing and fitting of 72 nos. top roller frame size 1250 mm of 4a bc, bc-1, bc-2, bc-5, bc-6 in oversize restriction plant and deshaling plant of sawang washery.
Dismantling, changing and fitting of 72 nos. top roller frame size 1250 mm of 4a bc, bc-1, bc-2, bc-5, bc-6 in oversize restriction plant and deshaling plant of sawang washery.
Read moreShifting, transporting and changing of different sizes of old conveyor by new conveyor and replacement and shifting of old and damaged drum by new drum at p.c.h. section, o/s plant, deshaling plant and main plant (as and when required) of sawang wash
Shifting, transporting and changing of different sizes of old conveyor by new conveyor and replacement and shifting of old and damaged drum by new drum at p.c.h. section, o/s plant, deshaling plant and main plant (as and when required) of sawang wash
Read moreRepairing, changing and replacement of different conveyors column of bc-4a, bc-4, bc-5, bc-6 etc. and bc-1, bc-3 er weight body structure of different belt conveyor in oversize restriction plant and deshaling plant at sawang washery.
Repairing, changing and replacement of different conveyors column of bc-4a, bc-4, bc-5, bc-6 etc. and bc-1, bc-3 er weight body structure of different belt conveyor in oversize restriction plant and deshaling plant at sawang washery.
Read moreRepairing / changing of impact crusher and screen cover plate and feed and discharge chute liner plate change etc. work in deshaling plant at sawang washery.
Repairing / changing of impact crusher and screen cover plate and feed and discharge chute liner plate change etc. work in deshaling plant at sawang washery.
Read moreRepairing and overhauling of different gear box of transfer bc cbh2-320, b side shuttle conveyor bc u-600, and a, b side feeder gear box u-600 and u-800 of picking bc in p.c.h. section of sawang washery.
Repairing and overhauling of different gear box of transfer bc cbh2-320, b side shuttle conveyor bc u-600, and a, b side feeder gear box u-600 and u-800 of picking bc in p.c.h. section of sawang washery.
Read moreDismantling, transporting, shifting, replacement and installation of different size motors for bc 9, vertical pump near (rom t/d), bc-6, dewatering screen, bc-4, 51 by pass bc s-1 screen, 40 bc, 52 bc, picking bc, a shuttle bc (old and new motors) e
Dismantling, transporting, shifting, replacement and installation of different size motors for bc 9, vertical pump near (rom t/d), bc-6, dewatering screen, bc-4, 51 by pass bc s-1 screen, 40 bc, 52 bc, picking bc, a shuttle bc (old and new motors) e
Read moreRepairing/ changing, replacement of different belt conveyor (04 bc, slurry bc, by pass bc, clean coal bc, middling coal bc, middling coal shuttle bc, stock pile bc etc) belt conveyor, structure, post, skirt guard, frame etc work of in main plant at
Repairing/ changing, replacement of different belt conveyor (04 bc, slurry bc, by pass bc, clean coal bc, middling coal bc, middling coal shuttle bc, stock pile bc etc) belt conveyor, structure, post, skirt guard, frame etc work of in main plant at
Read moreof your Industry type