Tender Details

Particulars Details
Title
Dismantling Fabrication And Erection And Fitting Of Rom B/C, Transfer B/C Motor And Gear Box Base Frame Structure Repairing Of Fresh Water Er Pipeline For Water Sprinkling In Both Side Hopper, Crusher Inlet And In Different Locations In P.C.H Sec
Description
Dismantling Fabrication And Erection And Fitting Of Rom B/C, Transfer B/C Motor And Gear Box Base Frame Structure Repairing Of Fresh Water Er Pipeline For Water Sprinkling In Both Side Hopper, Crusher Inlet And In Different Locations In P.C.H Sec
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_331659_1
Reference
Number
SGW/KTA/ENM/E-Tender/24-25/91 Date 07.03.2025
Tender Fee 0
EMD 2700
Tender Value
Place Office of the Project Officer, Sawang Washery
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343797

Start Date March 08, 2025 16:30
End Date
Expired 17/03/2025

Expired 459 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling, fabrication/erection, repairing of transfer b/c and r.o.m. b/c skirt frame, skirt rubber, take up drum structure etc. work at p.c.h. section of sawang washery.

Dismantling, fabrication/erection, repairing of transfer b/c and r.o.m. b/c skirt frame, skirt rubber, take up drum structure etc. work at p.c.h. section of sawang washery.

Read more
Fabrication/erection of steel structural work for b side grizzly and repairing of fresh water shower pipeline for water sprinkling in both side hopper at p.c.h. section of sawang washery.

Fabrication/erection of steel structural work for b side grizzly and repairing of fresh water shower pipeline for water sprinkling in both side hopper at p.c.h. section of sawang washery.

Read more
Fabrication/erection of steel structural work for b side grizzly and repairing of fresh water shower pipeline for water sprinkling in both side hopper at p.c.h. section of sawang washery.

Fabrication/erection of steel structural work for b side grizzly and repairing of fresh water shower pipeline for water sprinkling in both side hopper at p.c.h. section of sawang washery.

Read more
Dismantling, erection and fabrication of motor and gearbox base structure and its platform and fitting after modification and mounting of unit no. 68 crusher at secondary crusher and dismantling, erection and fabrication of head drum motor and gear

Dismantling, erection and fabrication of motor and gearbox base structure and its platform and fitting after modification and mounting of unit no. 68 crusher at secondary crusher and dismantling, erection and fabrication of head drum motor and gear

Read more
Fabrication/erection and repairing / replacement of r.o.m. b/c, picking b/c, transfer b/c, reversible b/c top carrier roller frame at p.c.h. section at sawang washery.

Fabrication/erection and repairing / replacement of r.o.m. b/c, picking b/c, transfer b/c, reversible b/c top carrier roller frame at p.c.h. section at sawang washery.

Read more
A)fabrication, erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (b)fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate c)fabrication, erection and fitting of

A)fabrication, erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (b)fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate c)fabrication, erection and fitting of

Read more
Dismantling, fabrication and erection of steel structure work of b side grizzly and repairing / changing of gear box and motor base frame structure of a side shuttle in pch section of sawang washery.

Dismantling, fabrication and erection of steel structure work of b side grizzly and repairing / changing of gear box and motor base frame structure of a side shuttle in pch section of sawang washery.

Read more
(a)dismantling, fabrication and erection of receiving chute of unit no. 250 screen in sec-ii, (b)dismantling, fabrication and erection of receiving plate (hit plate)of unit no. 250 screen in sec-ii, (c)dismantling, fabrication and erection of receivi

(a)dismantling, fabrication and erection of receiving chute of unit no. 250 screen in sec-ii, (b)dismantling, fabrication and erection of receiving plate (hit plate)of unit no. 250 screen in sec-ii, (c)dismantling, fabrication and erection of receivi

Read more
Fabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and instant er system at balram ocp, hingula area.

Fabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and instant er system at balram ocp, hingula area.

Read more
Fabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and and instant er system at balram ocp, hingula area.

Fabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and and instant er system at balram ocp, hingula area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise