Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Fabrication And Erection And Fitting Of Rom B/C, Transfer B/C Motor And Gear Box Base Frame Structure Repairing Of Fresh Water Er Pipeline For Water Sprinkling In Both Side Hopper, Crusher Inlet And In Different Locations In P.C.H Sec
|
| Description |
Dismantling Fabrication And Erection And Fitting Of Rom B/C, Transfer B/C Motor And Gear Box Base Frame Structure Repairing Of Fresh Water Er Pipeline For Water Sprinkling In Both Side Hopper, Crusher Inlet And In Different Locations In P.C.H Sec
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_331659_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/91 Date 07.03.2025 |
| Tender Fee | 0 |
| EMD | 2700 |
| Tender Value | |
| Place | Office of the Project Officer, Sawang Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343797 |
| Start Date | March 08, 2025 16:30 |
| End Date |
Expired
17/03/2025
Expired 459 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, fabrication/erection, repairing of transfer b/c and r.o.m. b/c skirt frame, skirt rubber, take up drum structure etc. work at p.c.h. section of sawang washery.
Dismantling, fabrication/erection, repairing of transfer b/c and r.o.m. b/c skirt frame, skirt rubber, take up drum structure etc. work at p.c.h. section of sawang washery.
Read moreFabrication/erection of steel structural work for b side grizzly and repairing of fresh water shower pipeline for water sprinkling in both side hopper at p.c.h. section of sawang washery.
Fabrication/erection of steel structural work for b side grizzly and repairing of fresh water shower pipeline for water sprinkling in both side hopper at p.c.h. section of sawang washery.
Read moreFabrication/erection of steel structural work for b side grizzly and repairing of fresh water shower pipeline for water sprinkling in both side hopper at p.c.h. section of sawang washery.
Fabrication/erection of steel structural work for b side grizzly and repairing of fresh water shower pipeline for water sprinkling in both side hopper at p.c.h. section of sawang washery.
Read moreDismantling, erection and fabrication of motor and gearbox base structure and its platform and fitting after modification and mounting of unit no. 68 crusher at secondary crusher and dismantling, erection and fabrication of head drum motor and gear
Dismantling, erection and fabrication of motor and gearbox base structure and its platform and fitting after modification and mounting of unit no. 68 crusher at secondary crusher and dismantling, erection and fabrication of head drum motor and gear
Read moreFabrication/erection and repairing / replacement of r.o.m. b/c, picking b/c, transfer b/c, reversible b/c top carrier roller frame at p.c.h. section at sawang washery.
Fabrication/erection and repairing / replacement of r.o.m. b/c, picking b/c, transfer b/c, reversible b/c top carrier roller frame at p.c.h. section at sawang washery.
Read moreA)fabrication, erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (b)fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate c)fabrication, erection and fitting of
A)fabrication, erection and fitting of unit no. 215 crusher (impact crusher) outer body lining using 10 mm plate, (b)fabrication, erection and fitting of unit no. 215 crusher motor base support using 16 mm plate c)fabrication, erection and fitting of
Read moreDismantling, fabrication and erection of steel structure work of b side grizzly and repairing / changing of gear box and motor base frame structure of a side shuttle in pch section of sawang washery.
Dismantling, fabrication and erection of steel structure work of b side grizzly and repairing / changing of gear box and motor base frame structure of a side shuttle in pch section of sawang washery.
Read more(a)dismantling, fabrication and erection of receiving chute of unit no. 250 screen in sec-ii, (b)dismantling, fabrication and erection of receiving plate (hit plate)of unit no. 250 screen in sec-ii, (c)dismantling, fabrication and erection of receivi
(a)dismantling, fabrication and erection of receiving chute of unit no. 250 screen in sec-ii, (b)dismantling, fabrication and erection of receiving plate (hit plate)of unit no. 250 screen in sec-ii, (c)dismantling, fabrication and erection of receivi
Read moreFabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and instant er system at balram ocp, hingula area.
Fabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and instant er system at balram ocp, hingula area.
Read moreFabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and and instant er system at balram ocp, hingula area.
Fabrication and erection of steel structure base frame and installation of fog cannon upon the structure base at different locations in mines and maintenance work of wheel washing and and instant er system at balram ocp, hingula area.
Read moreof your Industry type