Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Fabrication / Erection Of Top Roller Frame Of Different Belt Conveyors 40 Bc, 51 Bc By Pass Bc, Slurry Bc, Clean Coal, Middling Coal Bc And Clean Coal, Middling Coal Shuttle Bc Etc. Work In Main Plant Of Sawang Washery For A Period Of 06 Months.
|
Description |
Fabrication / Erection Of Top Roller Frame Of Different Belt Conveyors 40 Bc, 51 Bc By Pass Bc, Slurry Bc, Clean Coal, Middling Coal Bc And Clean Coal, Middling Coal Shuttle Bc Etc. Work In Main Plant Of Sawang Washery For A Period Of 06 Months.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_312514_1 |
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/47 Date 13.07.2024 |
Tender Fee | 0 |
EMD | 7300 |
Tender Value | |
Place | Office of the Project Officer, Sawang Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323868 |
Start Date | July 15, 2024 16:30 |
End Date |
24/07/2024 ( Expired 337 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transporting, shifting and changing of different size motors of 51bc, 40bc, bc-04, bc-05, bc-07, transfer bc, secondary crusher, impact crusher, clean coal shuttle bc, s-1 screen welding machine of p.c.h. and deshaling plant and dismantling and modif
Transporting, shifting and changing of different size motors of 51bc, 40bc, bc-04, bc-05, bc-07, transfer bc, secondary crusher, impact crusher, clean coal shuttle bc, s-1 screen welding machine of p.c.h. and deshaling plant and dismantling and modif
Read moreDismantling, fabrication / erection of different floor of deshaling plant for providing safe working place to employees of deshaling section of sawang washery.
Dismantling, fabrication / erection of different floor of deshaling plant for providing safe working place to employees of deshaling section of sawang washery.
Read moreDismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.
Dismantling fabrication erection and alignment of belt structure of 308 a n b side and side frame receiving chutes of secondary crusher a n b side of raw coal section at rajrappa washery project.
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreFabrication and installation of 8 nos. reclaimer feeder blades after dismantling of existing worn out blades for different belt conveyors of raw coal section at monidih coal washery.
Fabrication and installation of 8 nos. reclaimer feeder blades after dismantling of existing worn out blades for different belt conveyors of raw coal section at monidih coal washery.
Read moreFabrication / erection of bc-2 tail drum, h/d protective shield for rotating equipment and railing along the floor nearby bc-2 conveyor to pr any near miss or accident at deshaling plant of sawang washery.
Fabrication / erection of bc-2 tail drum, h/d protective shield for rotating equipment and railing along the floor nearby bc-2 conveyor to pr any near miss or accident at deshaling plant of sawang washery.
Read moreRepairing / replacement of pathway gantry, deck plate and footway plate of different belt conveyor bc-4a, bc-4, bc-5, bc-8, bc-9 and bc-10 of oversize plant of sawang washery.
Repairing / replacement of pathway gantry, deck plate and footway plate of different belt conveyor bc-4a, bc-4, bc-5, bc-8, bc-9 and bc-10 of oversize plant of sawang washery.
Read moreDismantling, changing and fitting of 72 nos. top roller frame size 1250 mm of 4a bc, bc-1, bc-2, bc-5, bc-6 in oversize restriction plant and deshaling plant of sawang washery.
Dismantling, changing and fitting of 72 nos. top roller frame size 1250 mm of 4a bc, bc-1, bc-2, bc-5, bc-6 in oversize restriction plant and deshaling plant of sawang washery.
Read moreDismantling, fabrication/erection of 51 bc discharge chute and di gate clean coal and middling coal of main plant plant of sawang washery.
Dismantling, fabrication/erection of 51 bc discharge chute and di gate clean coal and middling coal of main plant plant of sawang washery.
Read moreFabrication and installation of 8 nos. reclaimer feeder blades after dismantling of existing worn-out blades for different belt conveyors of raw coal section at monidih coal washery.
Fabrication and installation of 8 nos. reclaimer feeder blades after dismantling of existing worn-out blades for different belt conveyors of raw coal section at monidih coal washery.
Read moreof your Industry type