Tender Details
Particulars | Details |
---|---|
Title |
Fabrication / Erection Of Top Roller Frame Of Different Belt Conveyors 40 Bc, 51 Bc By Pass Bc, Slurry Bc, Clean Coal, Middling Coal Bc And Clean Coal, Middling Coal Shuttle Bc Etc. Work In Main Plant Of Sawang Washery For A Period Of 06 Months.
|
Description |
Fabrication / Erection Of Top Roller Frame Of Different Belt Conveyors 40 Bc, 51 Bc By Pass Bc, Slurry Bc, Clean Coal, Middling Coal Bc And Clean Coal, Middling Coal Shuttle Bc Etc. Work In Main Plant Of Sawang Washery For A Period Of 06 Months.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_312514_1 |
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/47 Date 13.07.2024 |
Tender Fee | 0 |
EMD | 7300 |
Tender Value | |
Place | Office of the Project Officer, Sawang Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323868 |
Start Date | July 15, 2024 16:30 |
End Date |
24/07/2024 ( Expired 295 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading 
 and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreFabrication and installation of 8 nos. reclaimer feeder blades after dismantling of existing worn out blades for different belt conveyors of raw coal section at monidih coal washery.
Fabrication and installation of 8 nos. reclaimer feeder blades after dismantling of existing worn out blades for different belt conveyors of raw coal section at monidih coal washery.
Read moreFabrication and erection of rcc tank by pass pipe line 6 inch dia water column to rlb new bunker side including valve fitting etc in rlb section of kathara washery
Fabrication and erection of rcc tank by pass pipe line 6 inch dia water column to rlb new bunker side including valve fitting etc in rlb section of kathara washery
Read moreFabrication / erection of bc-2 tail drum, h/d protective shield for rotating equipment and railing along the floor nearby bc-2 conveyor to pr any near miss or accident at deshaling plant of sawang washery.
Fabrication / erection of bc-2 tail drum, h/d protective shield for rotating equipment and railing along the floor nearby bc-2 conveyor to pr any near miss or accident at deshaling plant of sawang washery.
Read moreRepairing / replacement of pathway gantry, deck plate and footway plate of different belt conveyor bc-4a, bc-4, bc-5, bc-8, bc-9 and bc-10 of oversize plant of sawang washery.
Repairing / replacement of pathway gantry, deck plate and footway plate of different belt conveyor bc-4a, bc-4, bc-5, bc-8, bc-9 and bc-10 of oversize plant of sawang washery.
Read moreDismantling, changing and fitting of 72 nos. top roller frame size 1250 mm of 4a bc, bc-1, bc-2, bc-5, bc-6 in oversize restriction plant and deshaling plant of sawang washery.
Dismantling, changing and fitting of 72 nos. top roller frame size 1250 mm of 4a bc, bc-1, bc-2, bc-5, bc-6 in oversize restriction plant and deshaling plant of sawang washery.
Read moreDismantling, fabrication/erection of 51 bc discharge chute and di gate clean coal and middling coal of main plant plant of sawang washery.
Dismantling, fabrication/erection of 51 bc discharge chute and di gate clean coal and middling coal of main plant plant of sawang washery.
Read moreFabrication and installation of 8 nos. reclaimer feeder blades after dismantling of existing worn-out blades for different belt conveyors of raw coal section at monidih coal washery.
Fabrication and installation of 8 nos. reclaimer feeder blades after dismantling of existing worn-out blades for different belt conveyors of raw coal section at monidih coal washery.
Read moreDismantling, fabrication/erection of vibro feeder structure, chutes gate etc. 01 no., 02 no. road side and 03, 05 no. store side in main plant plant of sawang washery.
Dismantling, fabrication/erection of vibro feeder structure, chutes gate etc. 01 no., 02 no. road side and 03, 05 no. store side in main plant plant of sawang washery.
Read moreof your Industry type