Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy For Design And Cost Estimation Of The Design And Cost Estimation For Construction Of 24 Mtr Span Motor Bridge Of 1.5 Lane Class A Loading At Km 01 Of Bangar Village To Pali Village Motor Road Of Pauri Tangroli M/R In Block Pauri Of Con
|
| Description |
Consultancy For Design And Cost Estimation Of The Design And Cost Estimation For Construction Of 24 Mtr Span Motor Bridge Of 1.5 Lane Class A Loading At Km 01 Of Bangar Village To Pali Village Motor Road Of Pauri Tangroli M/R In Block Pauri Of Con
|
| Organisation | PWD | 12th Circle Pauri |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 1180 |
| EMD | 22000 |
| Tender Value | - |
| Place | Uttarakhand |
| Link | Login to view |
| Start Date | September 26, 2026 22:30 |
| End Date |
Closing soon
14/10/2026
1 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design and cost estimation for construction of single span 400 meter two lane class a loading motor bridge
Design and cost estimation for construction of single span 400 meter two lane class a loading motor bridge (design and drawing of bridge, vetting of design and drawing, preparation of dpr and forest proposal in distt. champawat uttarakhand india
Read moreConstruction of 66m span 2-lane class-a loading motor bridge at km-4 and 36m span 2-lane class-a loading motor bridge at km-6 of thalisain bhungidhar deghat manila dotiyal marchula motor road (sh-52) in district pauri garhwal under epc mode.
Construction of 66m span 2-lane class-a loading motor bridge at km-4 and 36m span 2-lane class-a loading motor bridge at km-6 of thalisain bhungidhar deghat manila dotiyal marchula motor road (sh-52) in district pauri garhwal under epc mode.
Read moreConstruction of total six no. 2-lane class-a loading motor bridges of span 36m, 42m, 20m, 15m, 18m and 36m on various kms of marchula saraikhet baijro pokhra satpuli pauri motor road (sh 32) in district pauri garhwal under epc mode.
Construction of total six no. 2-lane class-a loading motor bridges of span 36m, 42m, 20m, 15m, 18m and 36m on various kms of marchula saraikhet baijro pokhra satpuli pauri motor road (sh 32) in district pauri garhwal under epc mode.
Read moreDesign and cost estimation for construction of 18 mtr. span 2 lane motor bridge at selaqui- bhauwala- dunga to paundha - nanda ki chauki first phase
Design and cost estimation for construction of 18 mtr. span 2 lane motor bridge at selaqui- bhauwala- dunga to paundha - nanda ki chauki first phase
Read moreDesign and cost estimation for construction of 25 mtr. span (1.50 lane) motor bridge at rampur kaichiwal m/r in km 3 over ramkhali nala ( first phase)
Design and cost estimation for construction of 25 mtr. span (1.50 lane) motor bridge at rampur kaichiwal m/r in km 3 over ramkhali nala ( first phase)
Read moreConsultancy for design and cost estimation for construction of km 5 (36 m span), km 6 (21 m span) and km 8 (8 m span) of peepna kola rankuna gohali motor road in vidhansabha sult of district almora
Consultancy for design and cost estimation for construction of km 5 (36 m span), km 6 (21 m span) and km 8 (8 m span) of peepna kola rankuna gohali motor road in vidhansabha sult of district almora
Read moreDesign and cost estimation for construction of 36 mtr. span (1.50 lane) motor bridge for village silkoti over badli in sahastradhara - majhada motor road km. 1 mussoorie constituency under c.m. ghosana no 1585/2021
Design and cost estimation for construction of 36 mtr. span (1.50 lane) motor bridge for village silkoti over baldi river in sahastradhara -majhada motor road km. 1 mussoorie constituency under c.m. ghosana no. 1585/2021
Read moreFe analysis, design and cost estimation for drum storage and retrieval system
Fe analysis, design and cost estimation for drum storage and retrieval system
Read moreDesign and cost estimation for construction of circuit house in district bageshwar
Design and cost estimation for construction of circuit house in district bageshwar
Read moreDesign and cost estimation for converting class b loading bridge to 1.5 lane class a loading bridge at km 1.00 span 33.33 m., km 14.00 span 24.38 m., km 26.00 span 24.38 m., km 31.00 span 38.48, of adibadri-nauti motor road (sh-93) in dist. chamoli
Design and cost estimation for converting class b loading bridge to 1.5 lane class a loading bridge at km 1.00 span 33.33 m., km 14.00 span 24.38 m., km 26.00 span 24.38 m. , km 31.00 span 38.48, of adibadri-nauti motor road (sh-93) in district chamo
Read moreof your Industry type