Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm Unit Ii Complete Overhauling And Painting Of Instrument Air Compressors Iac 2 A 2 B 2 C
|
| Description |
Mtps I Tm Unit Ii Complete Overhauling And Painting Of Instrument Air Compressors Iac 2 A 2 B 2 C
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_512376_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 279 / 2024-25 |
| Tender Fee | 0 |
| EMD | 4500 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=609277 |
| Start Date | December 19, 2024 23:30 |
| End Date |
Expired
02/01/2025
Expired 653 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b and 2c for the year 2026 2027
Mtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b and 2c for the year 2026 2027
Read moreMtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Read moreImprovement work of vasundhara sai-2a, 2b and 2c road by resurfacing and perforated tiles on side panels.
Improvement work of vasundhara sai-2a, 2b and 2c road by resurfacing and perforated tiles on side panels.
Read moreMtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Read moreMtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Read moreOe9713562143-inlet expansion joint-fr6b,oe9713562160-inlet expansion joint fr-6b,ej-in-v,oe9713563247-expansion joint, ej6-2a,oe9713563255-expansion joint, ej6-2b,oe9713563263-expansion joint, ej6-2c,oe9713563468-expansion joint, ej6b-1,oe9713563662-expansion joint ej6b-3
Oe9713562143-inlet expansion joint-fr6b,oe9713562160-inlet expansion joint fr-6b,ej-in-v,oe9713563247-expansion joint, ej6-2a,oe9713563255-expansion joint, ej6-2b,oe9713563263-expansion joint, ej6-2c,oe9713563468-expansion joint, ej6b-1,oe9713563662-expansion joint ej6b-3
Read moreMtps i tm unit ii cleaning and painting of inner and outer portion of receiver tanks of 1 and 2 for instrument air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type etc
Mtps i tm unit ii cleaning and painting of inner and outer portion of receiver tanks of 1 and 2 for instrument air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type etc
Read moreNctps i operation circle ca dn cwph breakdown works of unit ii cooling water pumps 2a 2b 2c and its suction bay travelling water screen system bhel make model cw1q vertical pump capacity 16 500m3 hr per pump during the year 2026 27
Nctps i operation circle ca dn cwph breakdown works of unit ii cooling water pumps 2a 2b 2c and its suction bay travelling water screen system bhel make model cw1q vertical pump capacity 16 500m3 hr per pump during the year 2026 27
Read moreMtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main
Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main
Read moreof your Industry type