Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm Unit Iv Complete Overhauling And Painting Of Instrument Air Compressors Iac 4 A 4 B 4 C
|
| Description |
Mtps I Tm Unit Iv Complete Overhauling And Painting Of Instrument Air Compressors Iac 4 A 4 B 4 C
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_557572_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / TM / OT. 97 / 2025-26 |
| Tender Fee | 0 |
| EMD | 4200 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=665967 |
| Start Date | May 13, 2025 23:30 |
| End Date |
Expired
27/05/2025
Expired 508 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b and 2c for the year 2026 2027
Mtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b and 2c for the year 2026 2027
Read moreTtps operation circle cad unit iv and v overhauling of heat exchangers 4a, 4b, 4c, 5a, 5b and 5c, cleaning and painting of auxiliary cooling water tank of unit iv and v acw system
Ttps operation circle cad unit iv and v overhauling of heat exchangers 4a, 4b, 4c, 5a, 5b and 5c, cleaning and painting of auxiliary cooling water tank of unit iv and v acw system
Read moreTtps operation circle mpm ii unit iv renewal of badly eroded area of one portion of each mill separator body in mill 4a, 4b and 4d
Ttps operation circle mpm ii unit iv renewal of badly eroded area of one portion of each mill separator body in mill 4a, 4b and 4d
Read moreMtps i tm unit ii cleaning and painting of inner and outer portion of receiver tanks of 1 and 2 for instrument air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type etc
Mtps i tm unit ii cleaning and painting of inner and outer portion of receiver tanks of 1 and 2 for instrument air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type etc
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreMtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Read moreTtps operation circle cad unit iv cw pump 6.6kv, 570 kw jyoti make cw pump ht motors location 4a to 4d cleaning of side air cooler set, top fan, top fan cover, motor cooler chamber and renewal of grease and painting works during the forthcoming over
Ttps operation circle cad unit iv cw pump 6.6kv, 570 kw jyoti make cw pump ht motors location 4a to 4d cleaning of side air cooler set, top fan, top fan cover, motor cooler chamber and renewal of grease and painting works during the forthcoming over
Read moreMtps i tm unit iii and iv complete overhauling and painting of instrument air compressors iac 3a 3c 4a and 4c
Mtps i tm unit iii and iv complete overhauling and painting of instrument air compressors iac 3a 3c 4a and 4c
Read moreMtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b 2c
Mtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b 2c
Read moreMtps i tm unit iii complete overhauling and painting of instrument service air compressors iac 3b sac 3c
Mtps i tm unit iii complete overhauling and painting of instrument service air compressors iac 3b sac 3c
Read moreof your Industry type