Tender Details

Particulars Details
Title
C/O W.B.M. To Itoli To Bamani Chak Road V.R. 69 At Km. 0/000 To 1/000, Ta. Sindewahi
Description
C/O W.B.M. To Itoli To Bamani Chak Road V.R. 69 At Km. 0/000 To 1/000, Ta. Sindewahi
Organisation Government of Maharashtra
Tender Id 2023_CHAND_943235_16
Reference
Number
WORKS_ZP_CHANDRAPUR_6_23_24
Tender Fee 2000
EMD 0
Tender Value
Place E E WORKS ZP CHANDRAPUR
Link https://mahatenders.gov.in
Start Date September 11, 2023 22:30
End Date

25/09/2023 ( Expired 605 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode

Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode

Read more
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km

Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km

Read more
Pr of road from nh 08 ptl petrol pump to ptl railway station road l 1 00 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00 km to ch 1 00km

Pr of road from nh 08 ptl petrol pump to ptl railway station road l 1 00 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00 km to ch 1 00km

Read more
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km

Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km

Read more
Periodical repair of the road from darchawi road to the garden of miss lawmi darlong via tlangpar para total l 1 40 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 0 00 km to 1 00 km

Periodical repair of the road from darchawi road to the garden of miss lawmi darlong via tlangpar para total l 1 40 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 0 00 km to 1 00 km

Read more
Pr of road from nh 208 road to joyganti para via nakulsingh debbarma house during the year 2025 26 sh soling carpeting and seal coat etc from ch 0 45 km to 1 00 km

Pr of road from nh 208 road to joyganti para via nakulsingh debbarma house during the year 2025 26 sh soling carpeting and seal coat etc from ch 0 45 km to 1 00 km

Read more
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1

Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1

Read more
Const of w.b.m. b.t. road from ratnai yashwantnagar to s.h. 152 v. r. 324 ch. 0/00 to 1/500 k.m. tal malshiras

Const of w.b.m. b.t. road from ratnai yashwantnagar to s.h. 152 v. r. 324 ch. 0/00 to 1/500 k.m. tal malshiras

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise