Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Both Side Final Drive, Cracked Portion Chassis And Foundation Eyes Of Dumper Model Bh60 M Sl. No. D60404 Of Sirka Colliery.
|
| Description |
Repairing Of Both Side Final Drive, Cracked Portion Chassis And Foundation Eyes Of Dumper Model Bh60 M Sl. No. D60404 Of Sirka Colliery.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_324156_1 |
|
Reference Number |
SO(X)(A)/e-NIT/41/24-25/145 |
| Tender Fee | 0 |
| EMD | 2900 |
| Tender Value | - |
| Place | Sirka |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336008 |
| Start Date | December 26, 2024 15:30 |
| End Date |
Expired
06/01/2025
Expired 646 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of cls system, cracked dump body and auto electric system in equipment no. bh60m dumper sl. no. 60777/d13140 at jharkhand ocp
Repairing of cls system, cracked dump body and auto electric system in equipment no. bh60m dumper sl. no. 60777/d13140 at jharkhand ocp
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreRepairing of both side final drive, cracked portion chassis and foundation eyes of dumper model bh60m sl. no. 60782 of gidi-a project.
Repairing of both side final drive, cracked portion chassis and foundation eyes of dumper model bh60m sl. no. 60782 of gidi-a project.
Read moreRepairing of fuel tank in bh60m d60404 and d60399 dumpers of sirka ocp.
Repairing of fuel tank in bh60m d60404 and d60399 dumpers of sirka ocp.
Read moreRepairing of boom foundation eyes, chain link and cracked portion of chassis of ck300 shovel, sl. no. 738 at birsa project.
Repairing of boom foundation eyes, chain link and cracked portion of chassis of ck300 shovel, sl. no. 738 at birsa project.
Read moreRemoval and repairing of connecting rod (pan rod-04 nos. and radius rod-04 nos.) and repairing of cracked portion of chassis and cracked portion of foundation eyes of komatsu dumper sl. no. 10298 and 10339 of gidi-c project.
Removal and repairing of connecting rod (pan rod-04 nos. and radius rod-04 nos.) and repairing of cracked portion of chassis and cracked portion of foundation eyes of komatsu dumper sl. no. 10298 and 10339 of gidi-c project.
Read moreRepairing of window mechanism of dumper sl. no. d60399, d60404 and water sprinkler of sirka ocp.
Repairing of window mechanism of dumper sl. no. d60399, d60404 and water sprinkler of sirka ocp.
Read moreRepairing and charging of air conditioning system in hemms bh60m dumpers sl. no. d3637, d60398, d60404 , d60407 of sirka ocp.
Repairing and charging of air conditioning system in hemms bh60m dumpers sl. no. d3637, d60398, d60404 , d60407 of sirka ocp.
Read moreRepairing of final drive system of bh60m model dumper sl.
Repairing of final drive system of bh60m model dumper sl. no. 60167 at nichitpur ocp, sijua area
Read moreof your Industry type