Tender Details

Particulars Details
Title
Repairing Of Boom Foundation Eyes, Chain Link And Cracked Portion Of Chassis Of Ck300 Shovel, Sl. No. 738 At Birsa Project.
Description
Repairing Of Boom Foundation Eyes, Chain Link And Cracked Portion Of Chassis Of Ck300 Shovel, Sl. No. 738 At Birsa Project.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_328047_1
Reference
Number
PEX/BP/e-NIT/24-25/52 dt.05.02.2025
Tender Fee 0
EMD 4200
Tender Value -
Place PE(Excv.) Office, Birsa Project
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340030

Start Date February 06, 2025 16:30
End Date
Expired 17/02/2025

Expired 604 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repairing of boom foundation eyes (both side) and boom- stick eyes, repairing of upper turret structure cowling case, counter weight foundation, bucket eye holes, babc and connecting rod with fitment of bushes in ck300 shovel sl.no. 759 of religara c

Repairing of boom foundation eyes (both side) and boom- stick eyes, repairing of upper turret structure cowling case, counter weight foundation, bucket eye holes, babc and connecting rod with fitment of bushes in ck300 shovel sl.no. 759 of religara c

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Repairing of cracked chassis of shovel no. ck300, l t 721.

Repairing of cracked chassis of shovel no. ck300, l t 721.

Read more
Repairing of stick cylinder,operator cabin,reinforcemnet of bucket and cracked boom for ck300 shovel b0754 of birsa project

Repairing of stick cylinder,operator cabin,reinforcemnet of bucket and cracked boom for ck300 shovel b0754 of birsa project

Read more
Repairing of cracked chassis in undercarriage structure of shovel no. ck300, 721

Repairing of cracked chassis in undercarriage structure of shovel no. ck300, 721

Read more
Repairing of cracked chassis (near rear swing circle) of shovel no. ck300 721.

Repairing of cracked chassis (near rear swing circle) of shovel no. ck300 721.

Read more
Repairing of both side final drive, cracked portion chassis and foundation eyes of dumper model bh60m sl. no. d60404 of sirka colliery.

Repairing of both side final drive, cracked portion chassis and foundation eyes of dumper model bh60m sl. no. d60404 of sirka colliery.

Read more
Repairing of cracked boom (opposite of cabin) side face of shovel no. 721, l t ck300.

Repairing of cracked boom (opposite of cabin) side face of shovel no. 721, l t ck300.

Read more
Repairing of both side final drive, cracked portion chassis and foundation eyes of dumper model bh60m sl. no. 60782 of gidi-a project.

Repairing of both side final drive, cracked portion chassis and foundation eyes of dumper model bh60m sl. no. 60782 of gidi-a project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise