Tender Details

Particulars Details
Title
Repairing Of Cracked Base Plate And Side Walls Of Bucket Assembly And Repairing/Replacement Of Lighting, Wiring And Auto Electrical System Of Tata Hitachi Excavator Sl. No. 165
Description
Repairing Of Cracked Base&#X0d Plate And Side Walls Of Bucket&#X0d Assembly And&#X0d Repairing/Replacement Of&#X0d Lighting, Wiring And Auto&#X0d Electrical System Of Tata&#X0d Hitachi Excavator Sl. No. 165
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_327258_1
Reference
Number
PE(X)/Tapin (N) OCP/NIT/24-25/42 Dated 29.01.2025
Tender Fee 0
EMD 4700
Tender Value -
Place Tapin North OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339196

Start Date January 29, 2025 23:30
End Date
Expired 10/02/2025

Expired 614 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Bucket assy. 5.6 cu m part no. tb03726 for tata hitachi ex1200 hydraulic excavator.

Bucket assy. 5.6 cu m part no. tb03726 for tata hitachi ex1200 hydraulic excavator.

Read more
Recon main hydraulic pump part no. ya00003078rm of tata hitachi ex1200 hydraulic excavator.

Recon main hydraulic pump part no. ya00003078rm of tata hitachi ex1200 hydraulic excavator.

Read more
New cummins qsk 23 c engine for tata hitachi ex 1200 hyd. excavator,new cummins nta 855 c engine for beml bh35-2 dumpers

New cummins qsk 23 c engine for tata hitachi ex 1200 hyd. excavator,new cummins nta 855 c engine for beml bh35-2 dumpers

Read more
Repairing / replacement of tooth adaptor and tooth point of bucket assly of tata hitachi ex1200v sl.no. oaby 2029 of abdkg colliery, bastacolla area ix.

Repairing / replacement of tooth adaptor and tooth point of bucket assly of tata hitachi ex1200v sl.no. oaby 2029 of abdkg colliery, bastacolla area ix.

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Repairing of boom assembly, boom cylinder housing, cracked base plate and side walls of bucket assembly of tata hitachi excavator sl.no. 194 at tapin north ocp, hazaribagh area.

Repairing of boom assembly, boom cylinder housing, cracked base plate and side walls of bucket assembly of tata hitachi excavator sl.no. 194 at tapin north ocp, hazaribagh area.

Read more
Repairing of engine guard, front bumper and front suspension (lh and rh) both sides of cat773e dumper sl. no. 1025 and repairing of cracked base plate and side walls of bucket assembly of tata hitachi excavator sl. no. 165 at tapin north ocp hzb area

Repairing of engine guard, front bumper and front suspension (lh and rh) both sides of cat773e dumper sl. no. 1025 and repairing of cracked base plate and side walls of bucket assembly of tata hitachi excavator sl. no. 165 at tapin north ocp hzb area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise