Tender Details
Particulars | Details |
---|---|
Title |
03 Dda S And Wm Bwn 2024 25
|
Description |
Excavation Of Water Harvesting Stucture Of Dimension (31.85 X 30.50 X 4.00)m Against Nmeo (Oilseed) 2024 25 Scheme Under Jamsole Mouza, J.L. No 063, Plot No 1449, 1453, 1454, 1455, 1459, G.P Bahadurpur Block Jamuria Under Paschim Bardhaman Dist
|
Organisation | DIRECTORATE OF AGRICULTURE | State Govt. and UT |
Tender Id | 2024_DOA_760924_5 |
Reference Number |
03-DDA-S and WM-BWN- 2024-25 |
Tender Fee | 0 |
EMD | 7013 |
Tender Value | |
Place | As mention in Name of Work or Work Deion |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1683725 |
Start Date | October 04, 2024 23:00 |
End Date |
21/10/2024 ( Expired 212 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jp/b957-500-mb-t-6600/1017 - sphere package of bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)
Sphere package of bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreRequest for proposal forselection of o and m vendor on annual license fee basis of bharat vandana park being developed by dda at dwarkasector-20,delhi
Request for proposal forselection of o and m vendor on annual license fee basis of bharat vandana park being developed by dda at dwarkasector-20,delhi
Read moreAAAAAAAAAA
Login to viewDevelopment of distribution infrastructure of 11 kv feeders (urban and industrial) emanating from 66 kv sub-stations palla, sector31, sector37, usa, green-field, surajkund of faridabad circle, dhbvn under revamped reforms-based and results-linked, di
Read moreAAAAAAAAAA
Login to viewProcurement of 8 nos. portable stationary compactor and 4 nos. hook loader and operation and maintenance of the 8 nos. portable stationary compactor and 4 nos. hook loader for five years.
Read moreJp/b862-201-pg-t-7490/1015 - steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreEngineering, procurement and construction (epc) for provision of or married accomodation (68 dus, s plus 17 floors) at colaba.
Engineering, procurement and construction (epc) for provision of or married accomodation (68 dus, s plus 17 floors) at colaba.
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreof your Industry type