Tender Details
Particulars | Details |
---|---|
Title |
Steamer Iron Press For Cloth,Led Rechargeable Bulb 9 W,Creeper For Vehicle,Water Motor 1 Hp,Washing M
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2025/B/5939324 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 12, 2025 03:10 |
End Date |
05/03/2025 ( Expired 71 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const of 200mm x 165mm x 170.00 m deep hydt well 2hp dc solar motor pump compete rcc water storage tank having capacity 12000 liters 7.00 m staging annual o and m cost for 5 years in a.n. college boys hostel dumka. group no itda-dmk-1
Const of 200mm x 165mm x 170.00 m deep hydt well 2hp dc solar motor pump compete rcc water storage tank having capacity 12000 liters 7.00 m staging annual o and m cost for 5 years in a.n. college boys hostel dumka. group no itda-dmk-1
Read moreHiring of one no m m bolero or other equivalent model bs vi commercial petrol or diesel vehicle along with driver for the office of the executive engineer water resource investigation division kunjaban agartala for the year 2024 25 2nd call
Hiring of one no m m bolero or other equivalent model bs vi commercial petrol or diesel vehicle along with driver for the office of the executive engineer water resource investigation division kunjaban agartala for the year 2024 25 2nd call
Read moreHiring of one no. m m bolero or other equivalent model bs vi commercial petrol or diesel vehicle along with driver for the office of the executive engineer water resource investigation division kunjaban agartala for the year 2024 25
Hiring of one no. m m bolero or other equivalent model bs vi commercial petrol or diesel vehicle along with driver for the office of the executive engineer water resource investigation division kunjaban agartala for the year 2024 25
Read moreOperation of 60/100 m head pump-motor with its running maintenance including all its electrical and mechanical accessories with water supply to the different colonies, basties, dhowrah for three years under aadocm, dhori area
Operation of 60/100 m head pump-motor with its running maintenance including all its electrical and mechanical accessories with water supply to the different colonies, basties, dhowrah for three years under aadocm, dhori area
Read moreConstruction of solar based water supply scheme with 1.0 hp dc solar motor pump complete and extra deep dt 125mm x115mm x120.00 m deep drilled tube well to supply water 2000 lph for 24x7 supply at habitation- munda upper tola, village- karamba
Construction of solar based water supply scheme with 1.0 hp dc solar motor pump complete and extra deep dt 125mm x115mm x120.00 m deep drilled tube well to supply water 2000 lph for 24x7 supply at habitation- munda upper tola, village- karamba
Read moreO and m - water supply schemes-hiring of vehicle 2025-26-hiring of vehicle -for the use of p h sub division, kollam
O and m - water supply schemes-hiring of&#x0d vehicle 2025-26-hiring of vehicle -for the&#x0d use of p h sub division, kollam
Read moreProviding new borewell (150 mm dia) inside the assistant engineer / assistant executive engineer / o m / t.kallupatty office campus with three phase 3.0 hp submergible motor and necessary pipeline arrangements to meet out the water demand for office
Providing new borewell (150 mm dia) inside the assistant engineer / assistant executive engineer / o m / t.kallupatty office campus with three phase 3.0 hp submergible motor and necessary pipeline arrangements to meet out the water demand for office
Read moreO and m - water supply schemes-kwa-hiring of vehicle-below 1500cc model not before 2020 on contract basis for one year for the various works under wsp sub division, harippad
O and m - water supply schemes-kwa-hiring of vehicle-below 1500cc model not before 2020 on contract basis for one year for the various works under wsp sub division, harippad
Read moreDay to day operation of water supply pumps in 2 two shifts per day including minor maintenance of pumps and motor switch panel board and also back washing of iron removal water treatment plant in 2 two times a week for the period of one year at gobra
Day to day operation of water supply pumps in 2 two shifts per day including minor maintenance of pumps and motor switch panel board and also back washing of iron removal water treatment plant in 2 two times a week for the period of one year at gobra
Read moreof your Industry type