Tender Details
Particulars | Details |
---|---|
Title |
Wbphed/Ae/Hssd/Phed/ N Ie T 10 (2nd Call) Of 2024 25
|
Description |
Emergency Restoration Of Ci/Di Pipeline Along With Damaged Main Road Due To Laying Of Pipe Line Of Domjur (Zome 3) Khasmora Pwss Under Howrah Sadar Sub Divnision Phe Dte.
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2025_PHED_828888_5 |
Reference Number |
WBPHED/AE/HSSD/PHED/NIeT-10 (2nd Call) OF 2024-25 |
Tender Fee | 0 |
EMD | 38670 |
Tender Value | |
Place | ASSISTANT ENGINEER HOWRAH SADAR SUB-DIVISION PHE |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1845876 |
Start Date | March 19, 2025 23:30 |
End Date |
12/04/2025 ( Expired 51 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair and maintenance of ajanta buldana section of nh 753e from km 0.00 to 49.130 (length 49.130km) in the state of maharashtra (at risk and cost of contractor) (2nd call)
Repair and maintenance of ajanta buldana section of nh 753e from km 0.00 to 49.130 (length 49.130km) in the state of maharashtra (at risk and cost of contractor) (2nd call)
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read more6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreKmda/gap/se(n)/niq-03(2nd call)/25-26 sl no 02
Preparation of gis based detailed project report (dpr) for pollution abatement sewerage project (interception&#x0d and di with stp/fstp) at uluberia municipal town in west bengal.
Read moreKmda/gap/se(n)/niq-03(2nd call)/25-26 sl no 01
Preparation of detailed gis based project report for howrah added zone in i and d with stp/fstp basis for interception of 5 nos. polluted khals i.e.n. c. pal khal, singhi more khal, ,sankrail khal, sarenga canal and nazirganj khal.
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreDesign, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read moreAAAAAAAAAA
Login to viewIntegrated facility management and up keepment at the residence of the additional chief secretaries and residence of the chief advisor west bengal at 12 ballygunge circular road kolkata 19 under kolkata west division 2nd call
Read moreWbphed/ee/maad/niet _04 of 2025-2026. sl. no. 13
Maintenance and performing guarding in wtp premises of gour mahadipur w/s scheme, intake at sanibarighat p.s. english bazar under malda arsenic area water supply division, phed. (one year)
Read moreof your Industry type