Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Btps Tggenco
|
| Description |
Btps Chp Regular Maintenance And Minor Repair Works Of Mechanical Equipment To Stacker Cum Reclaimer 2 Pertaining To Mm Iv Sub Division Of Chp/Btps As And When Required For The Period From 01.04.2025 Or From Actual Date Of Commencement To 31.03.2026.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 591192 |
|
Reference Number |
e-08/2025-26 of CE/Const/BTPS(SE/CHP/BTPS) |
| Tender Fee | 355 |
| EMD | 15020 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | April 26, 2025 01:30 |
| End Date |
Expired
13/05/2025
Expired 522 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of slew vfd for stacker reclaimer chp stage 2 ntpc tanda
Procurement of slew vfd for stacker reclaimer chp stage 2 ntpc tanda
Read moreSupply of landt make mechanical spares of stacker cum reclaimer, reclaimer and apron feeder installed at chp, csctpp, chhabra
Supply of landt make mechanical spares of stacker cum reclaimer, reclaimer and apron feeder installed at chp, csctpp, chhabra
Read moreProcurement of spares for auto-lubrication system of stacker reclaimer stage-3 chp rihand.
Procurement of spares for auto-lubrication system of stacker reclaimer stage-3 chp rihand.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreRequirement of hydraulic pump and oil circulation pumps installed at stacker-cum-reclaimer, reclaimer, ring granulator and apron feeder at chp, ssctps, suratgarh
Requirement of hydraulic pump and oil circulation pumps installed at stacker-cum-reclaimer, reclaimer, ring granulator and apron feeder at chp, ssctps, suratgarh
Read moreSupply of batteries for dozers, wheel loaders , ace 12t crane pertaining to mm-iv/chp/btps
Supply of batteries for dozers, wheel loaders , ace 12t crane pertaining to mm-iv/chp/btps
Read moreKtps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreAnnual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Read moreRetrofitting, testing and commissioning of abb make 12kv,1250a, 40ka, ht breakers with cradle solution in place of jyothi make ht breaker at control room swgr and old ht breaker of stacker/reclaimer-3 at chp-1 rtps
Retrofitting, testing and commissioning of abb make 12kv,1250a, 40ka, ht breakers with cradle solution in place of jyothi make ht breaker at control room swgr and old ht breaker of stacker/reclaimer-3 at chp-1 rtps
Read moreof your Industry type