Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Spm Of The Authority The Rnfd Is Located In Front Of Devnarayan Hostel Located In The Town Plan. Box Culvert And Rcc Up To The Canal. Construction Work Of Drain.
|
| Description |
Spm Of The Authority The Rnfd Is Located In Front Of Devnarayan Hostel Located In The Town Plan. Box Culvert And Rcc Up To The Canal. Construction Work Of Drain.
|
| Organisation | UIT- Bharatpur | State Govt. and UT |
| Tender Id | 2025_UITBR_443299_1 |
|
Reference Number |
online nit27(2024-2025)01Urban Improvement Trust |
| Tender Fee | 3000 |
| EMD | 1.62 Lakh |
| Tender Value | |
| Place | BDA BHARATPUR |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=796355 |
| Start Date | January 15, 2025 16:30 |
| End Date |
Expired
06/02/2025
Expired 510 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction and covering of an rcc drain from chikwan tola locality in bhawaniganj ward, passing through peepal wala maidan, up to the mazar-wala drain.
Construction and covering of an rcc drain from chikwan tola locality in bhawaniganj ward, passing through peepal wala maidan, up to the mazar-wala drain.
Read moreRe-construction of rcc drain in kasna (dhanshree to asian paint company), greater noida.
Re-construction of rcc drain in kasna (dhanshree to asian paint company), greater noida.
Read moreRepairs/maintenance to drains, culvert and desilting of drain at various locations at hqtc.
Repairs/maintenance to drains, culvert and desilting of drain at various locations at hqtc.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreInvestigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &#x0d panchayat amethi distt lucknow up india
Read moreConstruction of cc road from gandhi chowk to sri siddeshwar temple in vijaypur city limits of vijaypur district. (including construction of duct, drain, foot-path and model street lighting)
Construction of cc road from gandhi chowk to sri siddeshwar temple in vijaypur city limits of vijaypur district. (including construction of duct, drain, foot-path and model street lighting)
Read moreRepair/ replacement of plumbing and
Repair/ replacement of plumbing and
 sanitary fittings, joinery, plinth protection
 and other connected items of work in md
 accn in domestic area at afs yelhanka
Read more90.construction of cc road, drain, and slab from sonu house to vishnu general store, from lalu house to umesh house, and from shivnath house to sarnam house in mohalla ramnagar.
90.construction of cc road, drain, and slab from sonu house to vishnu general store, from lalu house to umesh house, and from shivnath house to sarnam house in mohalla ramnagar.
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreof your Industry type