Tender Details
Particulars | Details |
---|---|
Title |
35 M Dismantling, Laying And Fitting Of 6 And 8 Dia. Suction Delivery Pipe Along With Repairing Of 1000 Gpm M7 P (Wilo) Pump Of Head 100 M, Si No 81284652/10s 1 For Quarry No 02 Under Kathara Colliery.
|
Description |
35 M Dismantling, Laying And Fitting Of 6 And 8 Dia. Suction Delivery Pipe Along With Repairing Of 1000 Gpm M7 P (Wilo) Pump Of Head 100 M, Si No 81284652/10s 1 For Quarry No 02 Under Kathara Colliery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_328372_1 |
Reference Number |
KTC/PE/EnM/24-25/207 Date-08.02.2025 |
Tender Fee | 0 |
EMD | 3200 |
Tender Value | |
Place | Office of the Project Officer, PE (EnM), Kathara C |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340371 |
Start Date | February 10, 2025 15:30 |
End Date |
20/02/2025 ( Expired 80 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting, installation of 3000 gpm, pump motor along with all electricals and 10 dia, delivery pipe line of bhowra south colliery approx length 642 mtr.
Shifting, installation of 3000 gpm, pump motor along with all electricals and 10 dia, delivery pipe line of bhowra south colliery approx length 642 mtr.
Read moreSinking of borewell (200.00 mtr depth) with installation of submersible pump and laying of 75mm dia. hdpe pipe-line (supplying, fitting and fixing) at purshabauripara within ward no-37 under dmc.
Sinking of borewell (200.00 mtr depth) with installation of submersible pump and laying of 75mm dia. hdpe pipe-line (supplying, fitting and fixing) at purshabauripara within ward no-37 under dmc.
Read moreDismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Read moreRepairing/ replacement of 1000 gpm pump, 4 stage make kirloskar brothers limited, head 150/200 mtr, model rkb 150/34k, sl. no. 12953210008 under churi project, nk area
Repairing/ replacement of 1000 gpm pump, 4 stage make kirloskar brothers limited, head 150/200 mtr, model rkb 150/34k, sl. no. 12953210008 under churi project, nk area
Read moreRepairing of two 1000 gpm pumps 100 meter head sl no syld/1000 gpm/01 and syld/1000 gpm/02 of sayald project
Repairing of two 1000 gpm pumps 100 meter head sl no syld/1000 gpm/01 and syld/1000 gpm/02 of sayald project
Read moreShifting, laying and fitting of different dia. pipeline with flange welding and dismantling of old ms pipeline as well as dismantling and shifting of pumps at different sumps, delivery/ suction pipe extension or shortening with float etc
Shifting, laying and fitting of different dia. pipeline with flange welding and dismantling of old ms pipeline as well as dismantling and shifting of pumps at different sumps, delivery/ suction pipe extension or shortening with float etc
Read moreRepairing and reconditioning of 2000 gpm, 02 stage, 540cum, 150 meter head sl. no.17042951/20/02/126071,flow more make pump of karma project kuju area.
Repairing and reconditioning of 2000 gpm, 02 stage, 540cum, 150 meter head sl. no.17042951/20/02/126071,flow more make pump of karma project kuju area.
Read moreRepairing of dme 150/200 pump, 1000 gpm, 100m head pump installed at quarry no.3 of religara colliery
Repairing of dme 150/200 pump, 1000 gpm, 100m head pump installed at quarry no.3 of religara colliery
Read moreRepairing /reconditioning /overhauling of 1000 gpm , 8 stage 280 mtr head, rkb pump make kirloskar under urimari ocp
Repairing/reconditioning/overhauling of 1000 gpm ,8 stage 280 mtr head, rkb pump make kirloskar of potanga quarry
 under urimari ocp.
Read moreRepairing of wilo make pump, 2000 gpm,250 mtr head 01 no and another pump 4000 gpm ,200 mtr head 01 no of jhingurda project
Repairing of wilo make pump, 2000 gpm,250 mtr head 01 no and another pump 4000 gpm ,200 mtr head 01 no of jhingurda project
Read moreof your Industry type