Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mechanical Repairing Of 370 Kw, 500 Hp,3.3 Kv,1489 Rpm, Ngr Make Induction Motor Attached With 1000 Gpm Pump Si No. 19801505 Installed At 02 No Quarry Of Kathara Ocp.
|
Description |
Mechanical Repairing Of 370 Kw, 500 Hp,3.3 Kv,1489 Rpm, Ngr Make Induction Motor Attached With 1000 Gpm Pump Si No. 19801505 Installed At 02 No Quarry Of Kathara Ocp.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_314354_1 |
Reference Number |
KTC/PE (EnM)/E-Tender/24-25/108 |
Tender Fee | 0 |
EMD | 4600 |
Tender Value | |
Place | Office of the Project Officer, PE (EnM), Kathara C |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=325767 |
Start Date | August 07, 2024 15:30 |
End Date |
16/08/2024 ( Expired 317 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair of 6.6kv slip ring type induction motor 750kw/1000hp jyoti make motor s. no. 134431 installed at tawi pump house jammu
Repair of 6.6kv slip ring type induction motor 750kw/1000hp jyoti make motor s. no. 134431 installed at tawi pump house jammu
Read moreOutsourcing of repair and maintenance of 02 nos. cat make d11t dozers s.n. t-661 and t-668 and 02 no. cat make 992k payloader s.n. p-642, p-515 and 01 no. cat make m24 motor grader s.n. 563 for a period of 365 days working at khadia project.
Outsourcing of repair and maintenance of 02 nos. cat make d11t dozers s.n. t-661 and t-668 and 02 no. cat make 992k payloader s.n. p-642, p-515 and 01 no. cat make m24 motor grader s.n. 563 for a period of 365 days working at khadia project.
Read moreDrilling of 175 mm dia 150 m deep tube well with installation of submersible motor pump includine electrification work with labor and material at site ward no. 28 kuber ashram file no. 142/25x9/1, 2nd call
Drilling of 175 mm dia 150 m deep tube well with installation of submersible motor pump includine electrification work with labor and material at site ward no. 28 kuber ashram file no. 142/25x9/1, 2nd call
Read moreRepairing of 6 up3 kirloskar make pumps (sl. no.-bar-02)running at bararee colliery of amal. joyrampur colliery under lodna area
Repairing of 6 up3 kirloskar make pumps (sl. no.-bar-02)running at bararee colliery of amal. joyrampur colliery under lodna area
Read moreTtps operation circle cad electrical sub division ii overhauling of 1 no. 6.6 kv, 570 kw jyoti make cooling water pump motor m9 sl.no.132304 at cwph ii
Ttps operation circle cad electrical sub division ii overhauling of 1 no. 6.6 kv, 570 kw jyoti make cooling water pump motor m9 sl.no.132304 at cwph ii
Read moreRepairing and rewinding of two nos of 550v, 150hp, 1440rpm induction motor, 75 hp, 1470rpm, 550v, 3 ph induction motor, 400a 3.3kv, vcb at madhaipur colliery, pandaverswar area
Repairing and rewinding of two nos of 550v, 150hp, 1440rpm induction motor, 75 hp, 1470rpm, 550v, 3 ph induction motor, 400a 3.3kv, vcb at madhaipur colliery, pandaverswar area
Read moreRepairing/ reconditioning of 315kva,3.3kv/550v flp transwitch unit,gec make, sl. no.ct3950/b22522 installed at 10 no. substation of sarubera of sarubera project under kuju area.
Repairing/ reconditioning of 315kva,3.3kv/550v flp transwitch unit,gec make, sl. no.ct3950/b22522 installed at 10 no. substation of sarubera of sarubera project under kuju area.
Read moreRepairing of rotor shaft 180 kw,3.3kv,1490 rpm make alstom sl. no. -18307332 at karma substation under kuju area
Repairing of rotor shaft 180 kw,3.3kv,1490 rpm make alstom sl. no. -18307332 at karma substation under kuju area
Read moreConstruction and installation of 3 no of shed to be installed at filter plant (1no.) for pump er and at quarry no.1 (2 no.) for 2000gpm pump er and switch of pundi project under kuju area
Construction and installation of 3 no of shed to be installed at filter plant (1no.) for pump er and at quarry no.1 (2 no.) for 2000gpm pump er and switch of pundi project under kuju area
Read moreLifting and lowering 1000 gpm, 200 mtr head submersible pump- motor 2(two) length cable and pipe (pump no -20 at 2 pit (m) gopalichak colliery.
Lifting and lowering 1000 gpm, 200 mtr head submersible pump- motor 2(two) length cable and pipe (pump no -20 at 2 pit (m) gopalichak colliery.
Read moreof your Industry type