Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Jharsuguda Bypass On Nh 49 From Ch 258.636 Km To Ch 283.300 Km (Design Chainage From Km 258.636 To Km 289.876) In The State Of Odisha Under Epc Mode
|
| Description |
Construction Of Jharsuguda Bypass On Nh 49 From Ch 258.636 Km To Ch 283.300 Km (Design Chainage From Km 258.636 To Km 289.876) In The State Of Odisha Under Epc Mode
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_755909_1 |
|
Reference Number |
09 CE NH of 2023 24 |
| Tender Fee | 35400 |
| EMD | 2.53 Crore |
| Tender Value | - |
| Place | O/O ADG Cum RO MORTH BHUBANESWAR |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | June 02, 2023 00:25 |
| End Date |
Expired
30/11/2023
Expired 1049 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode
Read moreConstruction of 30.00m steel composite girder bridge at km 31.600 design chainage 243.46 on gangotri rishikesh section of nh34 on epc mode in the state of uttarakhand under epc mode
Construction of 30.00m steel composite girder bridge at km 31.600 design chainage 243.46 on gangotri rishikesh section of nh34 on epc mode in the state of uttarakhand under epc mode
Read more4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
Read moreConstruction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Read moreAuthority engineer for supervision of up-gradation of existing highway to 4laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode
Authority engineer for supervision of up-gradation of existing highway to 4laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode
Read moreConstruction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Construction of service road along with 02 flyovers-underpasses at ch. 85.750 to 97.250 on guna bypass section of nh-46 in the state of madhya pradesh on epc mode
Read moreConstruction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.
Read moreConstruction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Read moreof your Industry type