Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constant Current Discharge Kit With Inbuilt Facility Of Stopping Automatically On Power Failure
|
| Description |
|
| Organisation | POWER GRID Corporation OF INDIA Limited | Ministry of Power |
| Tender Id | GEM/2024/B/4618576 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 28, 2024 18:27 |
| End Date |
Expired
20/03/2024
Expired 884 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
MADHAV ENGINEERS PRIVATE LIMITED
2249080
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | MADHAV ENGINEERS PRIVATE LIMITED | Make : IBEKO POWER AB (DV POWER) Model : BLU110T Title : CONSTANT CURRENT DISCHARGE KIT | 19-03-2024 18:29:11 | MII | Qualified |
| 2 | RUCHI ENERGY SOLUTION PRIVATE LIMITED | Make : Megger Model : TORKEL 930 Title : BATTERY DISCHARGE KIT | 19-03-2024 14:05:48 | MII | Disqualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | MADHAV ENGINEERS PRIVATE LIMITED | Item Categories : Constant current discharge kit with inbuilt facility of stopping automatically on power failure | 2249080.00 | L1 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| CONSTANT CURRENT DISCHARGE KIT | IBEKO POWER AB (DV POWER) | BLU110T | 2 | ₹ 2249080.000 |
Procurement of ai kit on arc basis as per technical specification
Procurement of ai kit on arc basis as per technical specification
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)
Read moreDesign, build, construct, install, and commissioning of material recovery facility for 5 tpd dry waste along with operation and maintenance of the plant for 5 years on epc mode in nagar parishad kanti.
Design, build, construct, install, and commissioning of material recovery facility for 5 tpd dry waste along with operation and maintenance of the plant for 5 years on epc mode in nagar parishad kanti.
Read moreEstablishment of advanced semiconductor processing cleanroom facility on turnkey basis including design, engineering, supply, installation, integration and commissioning in dept. of electronics engineering, iit(bhu), varanasi.
Establishment of advanced semiconductor processing cleanroom facility on turnkey basis including design, engineering, supply, installation, integration and commissioning in dept. of electronics engineering, iit(bhu), varanasi.
Read moreSelection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 05tpd for dry waste along with operation and maintenance of the plant for 5 years for nagar panchayat baisi
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05tpd for dry waste along with operation and maintenance of the plant for 5 years for nagar panchayat baisi
Read moreof your Industry type