Tender Details

Particulars Details
Title
Construction Of Pucca Drain From Jobrali Thakurtala To Gaur Mandals House Under Parulia Gp
Description
Construction Of Pucca Drain From Jobrali Thakurtala To Gaur Mandals House Under Parulia Gp
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2025_ZPHD_835528_2
Reference
Number
03/25-26/DH-I PS
Tender Fee 300
EMD 4260
Tender Value
Place BDO DH1
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1861940
Start Date April 11, 2025 23:00
End Date

22/04/2025 ( Expired 1 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana

Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana

Read more
Maintenance of ribander bypass from km 143/200 to km 152/820 on nh-748 in the state of goa under performance based maintenance contract (pbmc) 2024-25

Maintenance of ribander bypass from km 143/200 to km 152/820 on nh-748 in the state of goa under performance based maintenance contract (pbmc) 2024-25

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km

Read more

Gap filling with hdpe pipe line raigaon jharna and repairing of damaged pipe line during construction of drain installation of valve and other allied works for zi to zv under jaigaon development authority jda under alipurduar division phe dte.

Read more
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Read more
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana

Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise