Tender Details

Particulars Details
Title
Pipeline Replacement And Shifting Work In Sarsiya Due To The Widening And Strengthening Of The Sarsiya To Bhunwar Road Under Sub Division Jahajpur Division Shahpura Distt. Bhilwara
Description
Pipeline Replacement And Shifting Work In Sarsiya Due To The Widening And Strengthening Of The Sarsiya To Bhunwar Road Under Sub Division Jahajpur Division Shahpura Distt. Bhilwara
Organisation PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2000
EMD 29125
Tender Value
Place SHAHPURA
Link

AAAAAAAAAA

Login to view
Start Date June 04, 2025 15:30
End Date

16/06/2025 ( 8 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Widening and strengthening of nh 148b from km. 226.370 to km. 234.900 i.e. from tohana haryana border to moonak jakhal excluding stretch from km. 233.830 to km. 234.300 on epc mode in state of punjab

Widening and strengthening of nh 148b from km. 226.370 to km. 234.900 i.e. from tohana haryana border to moonak jakhal excluding stretch from km. 233.830 to km. 234.300 on epc mode in state of punjab

Read more
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more

Moei fans, rmo booster p/set in the r/o hmps bungalows under ferozshah road sub division-1, ded-201, dg. 2025-26. (sh: replacement of bollard, led fixture ei work at ab-3 purana quila road)

Read more
Lac-ads-providing paving of tiles in anganavadi varnamnagar-improvements to aganavadi varnamnagar road in ward 19 of edathala grama panchayath.-general civil work

Very&amp#x0d pathetic condition due to waterlogged area .this&amp#x0d estimate is proposed to upgrade the road&amp#x0d with 100 mm interlocking tile works and&amp#x0d provisions for earth filling, gsb, wmm,pcc ,&amp#x0d dr masonary and naming board are inluded in&amp#x0d this estimate.

Read more
Maintenance work from km 34/560 to km 36/000 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 34/560 to km 36/000 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise