Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair And Overhauling Service Repair Refurbishment Of Burners Register Of 02 In Nos Boilers I
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/3517479 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 12, 2023 21:39 |
| End Date |
Expired
21/06/2023
Expired 1208 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
NIYURA TECHNOLOGIES PRIVATE LIMITEDNEXTGENT T TRADING COMPANYGLOBAL LINK TRADERS...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| BPE 650VA | BPE | BPE 650VA | 2 | ₹ 3216.000 |
| DLINK SWITCH 8 PORT | D-Link | DES-1008C 10/100 Mbps Unmanaged Switch Network Switch | 6 | ₹ 4974.000 |
| RICOH Toner type 1230D Black | RICOH | RICOH Toner type 1230D Black | 5 | ₹ 21905.000 |
| HP 12A Black Original LaserJet Toner Cartridge Q2612AC | hp | HP 12A Black Original LaserJet Toner Cartridge Q2612AC | 10 | ₹ 42650.000 |
| FEVICOL SQUEEZY BOTTLE 200 gm | Fevicol | NAT-FEVICOL SQUEEZY BOTTLE 200 gm -A-I | 300 | ₹ 20250.000 |
| Luminous PC 18042 - 150AH Tubular Battery | LUMINOUS | Luminous PC 18042 - 150AH Tubular Battery with 42* months warrenty | 1 | ₹ 13850.000 |
| Nanochecker 710 | NANOCHECKER 710 | Nanochecker 710 | 1 | ₹ 349000.000 |
| JK | J K | Jk Easy Copier | 300 | ₹ 48897.000 |
| Lotus Eazy Ruled Register Hard Bound 96 Page 180 x 295 mm | LOTUS | Lotus Eazy 96 PAGES | 30 | ₹ 1080.000 |
| jungle boot direct moulded pu sole in pairs | Sk | SK | 13 | ₹ 4550.000 |
| Samsungtonercartridge MLT-D101S | SAMSUNG | MLT-D101S | 20 | ₹ 35900.000 |
| Notebook Computers-Laptop | Lenovo | Lenovo Notebook V110-i3 6th gen processor, 4GB RAM, 1TB HDD, 15.6" ,Win10pro,3 yrs | 5 | ₹ 165000.000 |
| Electronic Weighing Scale - Capacity 20 kg, Accuracy 5 g | PHOENIX | SMART-20 | 9 | ₹ 31500.000 |
| VIM SOAP | Vim | VIM SOAP | 50 | ₹ 1000.000 |
| spectra FS paper | Trident Paper FS | spectra FS 75 gsm | 100 | ₹ 21000.000 |
| COPIER PAPER A4 75 GSM CT | Trident | TRIDENT SPECTRA | 100 | ₹ 17550.000 |
| Bajaj Faratta 500mm Grey Pedestal Fan | BAJAJ | Bajaj Faratta 500mm Grey Pedestal Fan | 2 | ₹ 6599.980 |
| WONDER TAPE 2" 35 MTR TRASPARENT TAPE | wonder | WONDER TAPE 2" 35 MTR TRASPARENT TAPE | 100 | ₹ 2200.000 |
| HP LaserJet Pro P1108 Printer | hp | HP LaserJet Pro P1108 | 2 | ₹ 17600.000 |
| Rubber Gloves | NA | Rubber Gloves | 100 | ₹ 5900.000 |
Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Read moreRefurbishment and modernization of the existing library to integrate additional programmatic components, including breakout spaces, exhibition area, faculty room etc. in cnlu, patna.
Refurbishment and modernization of the existing library to integrate additional programmatic components, including breakout spaces, exhibition area, faculty room etc. in cnlu, patna.
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreManjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Manjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Read moreOperation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary
Operation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge.
Read moreof your Industry type