Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Stregthening To Konapal Bandivadekar Malgaon Road Odr 58 Km 0/100 To 1/200 Tal Sawantwadi
|
| Description |
Stregthening To Konapal Bandivadekar Malgaon Road Odr 58 Km 0/100 To 1/200 Tal Sawantwadi
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_SINDH_915851_4 |
|
Reference Number |
szp/wd/TENDER/MSS/08/23 |
| Tender Fee | 1000 |
| EMD | 20600 |
| Tender Value | |
| Place | Executive Engg. Work department z p sinhudurg |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | June 15, 2023 23:30 |
| End Date |
Expired
26/06/2023
Expired 1121 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Patch repair work on dlp road kachawa sewadara shahpura road 0/00 to 11/00 under sub dn. nechhawa
Patch repair work on dlp road kachawa sewadara shahpura road 0/00 to 11/00 under sub dn. nechhawa
Read moreIe services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreImprovement to konapal to bandivadekarwadi malgaon odr 58 at niravade. tal. sawantwadi
Improvement to konapal to bandivadekarwadi malgaon odr 58 at niravade. tal. sawantwadi
Read moreConstruction of bridge on nirawade konapal bandivadekarwadi malgaon road odr 58 at km 1/00 tal sawantwadi dist sindhudurg
Construction of bridge on nirawade konapal bandivadekarwadi malgaon road odr 58 at km 1/00 tal sawantwadi dist sindhudurg
Read moreStregthening to insuli kshetraphal vetye road odr 76 km 1/460 to 2/500 tal sawantwadi
Stregthening to insuli kshetraphal vetye road odr 76 km 1/460 to 2/500 tal sawantwadi
Read moreImprovement to konapal to bandivadekarwadi malgaon odr 58 at niravade. tal.
Improvement to konapal to bandivadekarwadi malgaon odr 58 at niravade. tal.&#x0d sawantwadi &#x0d
Read moreStreghtening to a road malgaon brahmnpat kadav ajgaokarwadi gosaviwadi road vr 243 in km 0/100 to 0/900 road tal sawantwadi
Streghtening to a road malgaon brahmnpat kadav ajgaokarwadi gosaviwadi road vr 243 in km 0/100 to 0/900 road tal sawantwadi
Read moreProviding stregthening and widening for dabholi wayangani road odr 52 km 0/00 to 5/200 tal vengurla
Providing stregthening and widening for dabholi wayangani road odr 52 km 0/00 to 5/200 tal vengurla
Read moreof your Industry type