Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design Development Facility
|
| Description |
Design Development Facility
|
| Organisation | Tamil Nadu Small Industries Development Corporation Limited | State Govt. and UT |
| Tender Id | 2025_TANSI_592677_1 |
|
Reference Number |
CFC/13/2025/DESIGN - 1 |
| Tender Fee | 0 |
| EMD | 1.21 Lakh |
| Tender Value | - |
| Place | NIFT TEA Knitwear, #163, Mudalipalayam, Tirupur |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=707802 |
| Start Date | August 14, 2025 16:30 |
| End Date |
Expired
15/09/2025
Expired 347 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Establishment of advanced semiconductor processing cleanroom facility on turnkey basis including design, engineering, supply, installation, integration and commissioning in dept. of electronics engineering, iit(bhu), varanasi.
Establishment of advanced semiconductor processing cleanroom facility on turnkey basis including design, engineering, supply, installation, integration and commissioning in dept. of electronics engineering, iit(bhu), varanasi.
Read moreProviding escalator facility near at cts no 4048/b (e- swathu 8896747784) dr babasaheb ambedkar garden in athani
Escalator
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 05tpd for dry waste along with operation and maintenance of the plant for 5 years for nagar panchayat baisi
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05tpd for dry waste along with operation and maintenance of the plant for 5 years for nagar panchayat baisi
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on.(group-01)
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Read moreDevelopment of material recovery facility (solid waste management project)
Development of material recovery facility (solid waste management project)
Read moreProviding consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Providing consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Read moreof your Industry type