Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improving Illumination At Dry Well At New Ghatkopar Pumping Station.
|
| Description |
Improving Illumination At Dry Well At New Ghatkopar Pumping Station.
|
| Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
| Tender Id | 2025_MCGM_1178906_1 |
|
Reference Number |
Dy.Ch.E./S.O./25-26/EQ-13/E.S. Dt-09.05.2025 |
| Tender Fee | 929 |
| EMD | 3000 |
| Tender Value | - |
| Place | New Ghatkopar Pumping Station |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2047176 |
| Start Date | May 17, 2025 16:30 |
| End Date |
Expired
26/05/2025
Expired 485 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Rblisp liftii operation and maintenance of rblis lift-ii stage-i pumping station at thirumalayapally (v), madanapur (m) and stage-ii pumping station at kothakota (v,m), wanaparthy (dist) for the year 2026-27 (from 01.10.2026 to 30.09.2027)
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreHiring of dewater pumps at dry well at new ghatkopar pumping station.
Hiring of dewater pumps at dry well at new ghatkopar pumping station.
Read moreNew ghatkopar pumping station
Hiring of dewater pumps at dry well at new ghatkopar pumping&#x0d station
Read moreNew ghatkopar pumping station
Overhauling of air supply blower system at dry well along with replacement of damaged ventillation ducting with allied works at new ghatkopar pumping station
Read moreRepairs to lift installed at new ghatkopar pumping station ghatkopar
Repairs to lift installed at new ghatkopar pumping station ghatkopar
Read moreImproving earthing system of ht, lt panels, ht motors and power transformers at new ghatkopar pumping station
Improving earthing system of ht, lt panels, ht motors and &#x0d power transformers at new ghatkopar pumping station.
Read moreof your Industry type