Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Link Road From Una Santoshgarh Road To Rampur Shiv Mandir Km.0.0 To 1.0 (Sh P F Paver Blocks At Rd.0.500 To 0.750) Under Otmnp
|
Description |
Construction Of Link Road From Una Santoshgarh Road To Rampur Shiv Mandir Km.0.0 To 1.0 (Sh P F Paver Blocks At Rd.0.500 To 0.750) Under Otmnp
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_99957_1 |
Reference Number |
Job04 C/O L/R from Una Santoshgarh road |
Tender Fee | 500 |
EMD | 36700 |
Tender Value | |
Place | Una |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=147033 |
Start Date | February 14, 2025 20:30 |
End Date |
20/02/2025 ( Expired 90 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreConstruction of 38337m long span bridge over chainth khad at km 2400 on link road bassi to sarkaghat under pmgsy3 batchi package no hp03171 a
Construction of 38337m long span bridge over chainth khad at km 2400 on link road bassi to sarkaghat under pmgsy3 batchi package no hp03171 a
Read moreNew construction (hill side cutting) of shivpuri to jajal motor road in the narendra nagar constituency of district tehri garhwal (phase ii stage i) under the honble c.m announcement no. 305-2014 ( from km 0.00 to km 5.00)
New construction (hill side cutting) of shivpuri to jajal motor road in the narendra nagar constituency of district tehri garhwal (phase ii stage i) under the honble c.m announcement no. 305-2014 ( from km 0.00 to km 5.00)
Read moreProviding and laying of interlocking paving blocks manufactured from industrial waste including wmm layers between km 40.00 to km 45.00 on road drass-umbala-sanku under 55 rcc/ 762 brtf project vijayak in the union territory of ladakh
Providing and laying of interlocking paving blocks manufactured from industrial waste including wmm layers between km 40.00 to km 45.00 on road drass-umbala-sanku under 55 rcc/ 762 brtf project vijayak in the union territory of ladakh
Read moreConstruction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a
Construction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Read moreConstruction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Read moreof your Industry type