Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Link Road From Sunehra Bridge To Abadi Near Iph Pump House Km.0.0 To 1.0 (Sh Pl Cc Pavement In Km.0.0 To 0.300) Under Otmnp
|
Description |
Construction Of Link Road From Sunehra Bridge To Abadi Near Iph Pump House Km.0.0 To 1.0 (Sh Pl Cc Pavement In Km.0.0 To 0.300) Under Otmnp
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_95809_1 |
Reference Number |
Job 03 C/O L/R from Sunehra bridge |
Tender Fee | 500 |
EMD | 39000 |
Tender Value | |
Place | Una |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=140702 |
Start Date | November 26, 2024 14:30 |
End Date |
02/12/2024 ( Expired 182 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConst. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreConstruction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.
Read moreWidening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreof your Industry type