Tender Details
Particulars | Details |
---|---|
Title |
Cluster Iv, (Area Of W.C 7, Sector 81, Phase Ii, Sector 83,88) Area (17485.00 Sqm)
|
Description |
Cluster Iv, (Area Of W.C 7, Sector 81, Phase Ii, Sector 83,88) Area (17485.00 Sqm)
|
Organisation | New Okla Industrial Development Authority | State Govt. and UT |
Tender Id | 2024_NOIDA_880356_1 |
Reference Number |
14/DGM(NTC)/SM(NTC)/2023-24 |
Tender Fee | 5310 |
EMD | 2.54 Lakh |
Tender Value | |
Place | NOIDA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1900150 |
Start Date | June 06, 2025 14:30 |
End Date |
12/06/2025 ( Expired 2 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read morePreparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu package 9
Consultancy services for preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu- package 1 punjai puliyampatti, bhavanisagar, sathyamangalam, bhavani
Read moreConstruction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read morePackage-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp
Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreConstruction of cc roads, paverblocks laying, sumpwell construction under mukhyamantri adhosanranchna phase iv 50l anudaan ghosna tonkkhurd, dewas, m.p. 455116
Construction of cc roads, paverblocks laying, sumpwell construction under mukhyamantri adhosanranchna phase iv 50l anudaan ghosna tonkkhurd, dewas, m.p. 455116
Read moreSelection of agency under swadesh darshan 2.0 scheme for development, operations, maintenance and management of tourism experience - tripura heritage and sangeet experience at agartala phase-i and ii
Selection of agency under swadesh darshan 2.0 scheme for development, operations, maintenance and management of tourism experience - tripura heritage and sangeet experience at agartala phase-i and ii
Read moreWork contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Work contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreof your Industry type