Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Lane / Drain In Upper Gaziabad Sunjwan Jammu (Under Non Plan)
|
| Description |
Construction Of Lane / Drain In Upper Gaziabad Sunjwan Jammu (Under Non Plan)
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_PWDJK_235581_3 |
|
Reference Number |
Short e-NIT No. DGN/24 of 2023-24 Dated 01-11-2023 |
| Tender Fee | 600 |
| EMD | 9840 |
| Tender Value | |
| Place | Jammu |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | November 02, 2023 21:30 |
| End Date |
Expired
09/11/2023
Expired 968 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Periodical service for otm building at tech area of 23 wing and kaluchak at af stn jammu under ge af jammu
Periodical service for otm building at tech area of 23 wing and kaluchak at af stn jammu under ge af jammu
Read moreConstruction of cc road in chander lane colony ward no 16 mc hisar
Construction of cc road in chander lane colony ward no 16 mc hisar
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreTerm contract for artificer works at transit camp jammu under age b/r-i of ge nagrota
Term contract for artificer works at transit camp jammu under age b/r-i of ge nagrota
Read morePeriodical service and camouflage painting to certain buildings and boundary wall in kaluchak area and 23 wing under ge af jammu
Periodical service and camouflage painting to certain buildings and boundary wall in kaluchak area and 23 wing under ge af jammu
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of drain from shravan kumhar house towards gopi lal house in kotwal ka kheda
Construction of drain from shravan kumhar house towards gopi lal house in kotwal ka kheda
Read moreRepair/ replacement of main filtration plant at upper gorkha camp including distribution pipe lines and connected items at wellington area under ge wellington
Repair/ replacement of main filtration plant at upper gorkha camp including distribution pipe lines and connected items at wellington area under ge wellington
Read moreConstruction of non-patchable / missing link roads in compliance of cm budget announcement 2022-23 in jaipur district package no rj-16-50/ml-np/ 2022-23 (risk and cost)
Construction of non-patchable / missing link roads in compliance of cm budget announcement 2022-23 in jaipur district package no rj-16-50/ml-np/ 2022-23 (risk and cost)
Read moreof your Industry type