Tender Details
Particulars | Details |
---|---|
Title |
Complete Rewinding / Repairing / Reconditioning Of Welding Machine 28 Kva, 440 V, 2 Ph, 50 Hz, 300 Amp, S/N Without Name Plate Installed At Various Place Inside Plant As And When Basis Of Sawang Washery.
|
Description |
Complete Rewinding / Repairing / Reconditioning Of Welding Machine 28 Kva, 440 V, 2 Ph, 50 Hz, 300 Amp, S/N Without Name Plate Installed At Various Place Inside Plant As And When Basis Of Sawang Washery.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_331948_1 |
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/98 Date 10.03.2025 |
Tender Fee | 0 |
EMD | 3400 |
Tender Value | |
Place | Office of the Project Officer, Sawang Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344120 |
Start Date | March 11, 2025 16:30 |
End Date |
20/03/2025 ( Expired 32 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Complete repairing / reconditioning of 3.3 kv ocb switch, 400 amp, make-bharat bijlee, s/n-sgw-2 installed at ht room for proper power supply to oversize restriction plant and ii) 3.3 kv ocb switch make-kirloskar, s/n-401001-34 installed at main sub-
Complete repairing / reconditioning of 3.3 kv ocb switch, 400 amp, make-bharat bijlee, s/n-sgw-2 installed at ht room for proper power supply to oversize restriction plant and ii) 3.3 kv ocb switch make-kirloskar, s/n-401001-34 installed at main sub-
Read moreComplete rewinding / repairing / reconditioning of welding machine 28kva, 440v, 2ph, 50hz, 300amp, s/n without name plate installed at various place inside plant as and when basis of sawang washery.
Complete rewinding / repairing / reconditioning of welding machine 28kva, 440v, 2ph, 50hz, 300amp, s/n without name plate installed at various place inside plant as and when basis of sawang washery.
Read moreAnnual rate contract for execution of various cutting welding jobs of cpp uty iii plant on as and when required basis for a period of one year
Annual rate contract for execution of various cutting welding jobs of cpp uty iii plant on as and when required basis for a period of one year
Read moreRepairing /rewinding with fixing and testing at site of 05 no brake coils of electric hoist, 3 nos thrust brake, 2 no 1500 va, 2 nos 1000 va rating control transformers and one no 200 amp single phase welding machine installed at various locations
Repairing /rewinding with fixing and testing at site of 05 no brake coils of electric hoist, 3 nos thrust brake, 2 no 1500 va, 2 nos 1000 va rating control transformers and one no 200 amp single phase welding machine installed at various locations
Read moreDay to day repairing, maintenance and testing of various 3.3 kv ers and fieldswitches and lt ers installed at mines and railway siding 1,2 and 3,4 at bhubaneswari ocp as and when required basis for a period of 1 year
Day to day repairing, maintenance and testing of various 3.3 kv ers and fieldswitches and lt ers installed at mines and railway siding 1,2 and 3,4 at bhubaneswari ocp as and when required basis for a period of 1 year
Read moreComplete repairing / rewinding / reconditioning of 08 nos. vibrator magnet coil, 440volt, 5amps, 2ph at rcb plant of sawang washery.
Complete repairing / rewinding / reconditioning of 08 nos. vibrator magnet coil, 440volt, 5amps, 2ph at rcb plant of sawang washery.
Read moreComplete repairing / reconditioning of 3.3kv ocb switch, 400amp, make-rerolled burn, s/n-wnp installed at main substation for controlling of plant 3.3kv grade capacitor bank and 11kv ocb switch, 400amp, make-gec, s/n-sgw-1 both installed at main subs
Complete repairing / reconditioning of 3.3kv ocb switch, 400amp, make-rerolled burn, s/n-wnp installed at main substation for controlling of plant 3.3kv grade capacitor bank and 11kv ocb switch, 400amp, make-gec, s/n-sgw-1 both installed at main subs
Read moreComplete repairing and reconditioning of 300kva x 2 440v l and t make capacitor bank installed at lt room of main washing plant of sawang washery.
Complete repairing and reconditioning of 300kva x 2 440v l and t make capacitor bank installed at lt room of main washing plant of sawang washery.
Read moreComplete rewinding of sq. cage induction motor 415volt, 3ph, 50hz. i) 93kw, 1480rpm, s/n- 1662201-12 and ii) 75kw, 1480rpm, s/n-348604603 of sawang washery.
Complete rewinding of sq. cage induction motor 415volt, 3ph, 50hz. i) 93kw, 1480rpm, s/n- 1662201-12 and ii) 75kw, 1480rpm, s/n-348604603 of sawang washery.
Read more(a)complete repairing/rewinding of 400 amp welding machine 440v/220v oil cool (b) complete repairing of mine line star delta starter 150 hp, 550 volt sl.no.107/sd, at filter plant (c) repairing of 400amp gec make 6.6 kv
(a)complete 
 repairing/rewinding 
 of 
 400 amp welding machine 
 440v/220v oil cool (b) 
 complete repairing of mine 
 line star delta starter 150 
 hp, 550 volt sl.no.107/sd, at 
 filter plant (c) repairing 
 of 400amp gec make 6.6 kv
Read moreof your Industry type