Tender Details
Particulars | Details |
---|---|
Title |
Improvement Of District Border Ghatghar To Sangamner Road (Sh 50) Km. 38/00 To 40/500, Tal. Akole, Dist. Ahmednagar
|
Description |
Improvement Of District Border Ghatghar To Sangamner Road (Sh 50) Km. 38/00 To 40/500, Tal. Akole, Dist. Ahmednagar
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1086519_1 |
Reference Number |
PWD SGM/ Notice No.16 for 2024-2025-2 |
Tender Fee | 2860 |
EMD | 1.5 Lakh |
Tender Value | |
Place | TAL.Akole |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1896251 |
Start Date | September 17, 2024 23:30 |
End Date |
24/09/2024 ( Expired 235 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConsultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConsultancy services for preparation of dpr for improvement of haryana-delhi border to punjabi bagh road (nh-09)
Consultancy services for preparation of dpr for improvement of haryana-delhi border to punjabi bagh road (nh-09)
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreImprovement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.
Improvement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreStrengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreImprovement of road from laljuri to madhab bari l 3 00 km under ridf xxix of nabard job no tp com 180 2023 24 3rd call
Improvement of road from laljuri to madhab bari l 3 00 km under ridf xxix of nabard job no tp com 180 2023 24 3rd call&#x0d
Read moreof your Industry type