Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Widening And Up Gradation Project 🛣️ The Ministry Of Road Transport And Highways, Central Government, Invites Bids From Eligible Contractors For The Widening, Reconstruction, And Up Gradation Of The Ahmednagar To Sabalkhed And Ashti To Chinchpur Section In Maharashtra To A 2 Lane Parallel Service Road With A Four Lane Configuration On An Epc (Engineering, Procurement, And Construction) Mode. 📅 Bid Submission Deadline: April 23, 2024, 5:00 Pm Earnest Money Deposit (Emd): Inr 46,00,000 Interested Bidders Must Submit Detailed Proposals, Including Technical And Financial Bids, By The Stipulated Deadline. The Project Aims To Enhance Road Infrastructure And Contribute To The Development Of The Region. Keywords: Infrastructure Development, Road Widening, Maharashtra, Ministry Of Road Transport And Highways, Epc Project, Bid Submission, Earnest Money Deposit| Particulars | Details |
|---|---|
| Title |
Widening, Reconstruction And Up Gradation To 2 Lps/ Four Lane Configuration For The Work Of Ahmednagar To Sabalkhed And Ashti To Chinchpur Section In The State Of Maharashtra On Epc Mode.
|
| Description |
Widening, Reconstruction And Up Gradation To 2 Lps/ Four Lane Configuration For The Work Of Ahmednagar To Sabalkhed And Ashti To Chinchpur Section In The State Of Maharashtra On Epc Mode.
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_799669_1 |
|
Reference Number |
RO/MUM/TENDER/2023-24/04 |
| Tender Fee | 0 |
| EMD | 4.6 Crore |
| Tender Value | - |
| Place | Sabalkhed |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840583 |
| Start Date | April 15, 2024 14:30 |
| End Date |
Expired
20/09/2024
Expired 755 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreUpgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Upgradation to four lane carriageway with paved shoulders of the nagaur city left out stretch in the state of rajasthan on epc mode
Read moreWidening to 4l ps configuration from km 6.600 to 16.300 of the khamgaon to shegaon section of n h 548c in the state of maharashtra on epc mode
Widening to 4l ps configuration from km 6.600 to 16.300 of the khamgaon to shegaon section of n h 548c in the state of maharashtra on epc mode
Read moreUpgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreConsultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreReconstruction of bridges major bridge at takera at ch 184.200 and four minor bridge at ch189.400, 190.600,191.400 and 193.200 on nh-57 in the state of odisha on epc mode
Reconstruction of bridges major bridge at takera at ch 184.200 and four minor bridge at ch189.400, 190.600,191.400 and 193.200 on nh-57 in the state of odisha on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type