Tender Details

Particulars Details
Title
Condtruction Of Leach Pit Or Soak Pit With Earth Work In Excavation, Cement Concrete Work As Per Proposed Ratio At 50 Nos Places Under Kranti Gp Area
Description
Condtruction Of Leach Pit Or Soak Pit With Earth Work In Excavation, Cement Concrete Work As Per Proposed Ratio At 50 Nos Places Under Kranti Gp Area
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2024_ZPHD_695544_1
Reference
Number
WB/01/SBM/KGP/2024-25
Tender Fee 7700
EMD 30695
Tender Value -
Place KRANTI GP AREA
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1514637

Start Date June 18, 2024 23:30
End Date
Expired 05/07/2024

Expired 831 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Construction of leach pit or soak pit with earth work in excavation, cement concrete work

Construction of leach pit or soak pit with earth work in excavation, cement concrete work. 25 unit, 1st set.

Read more
Construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm /125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code mentioned in pr

Construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm /125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code mentioned in pr

Read more
Construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm /125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code mentioned in pr

Construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm /125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code mentioned in pr

Read more
3rd call construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm 125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code me

3rd call&amp#x0d construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm 125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code me

Read more
Construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm /125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code mentioned in pr

Construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm /125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code mentioned in pr

Read more
Construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm /125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code mentioned in pr

Construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm /125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code mentioned in pr

Read more
Construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm /125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code mentioned in pr

Construction of leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm /125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of is code mentioned in pr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise